Purchase Order DJBP0117RP140067
Award Date 12/7/15
Potential Completion Date 12/31/15
Potential Value $8.3K
Federal Agency
Awardee
Ultimate Awardee
Not listed PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Kingsport, TN 37663, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
3
Legislative Mandate
Not listed National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- Unit-Asrc Construction, LLC was awarded a $141.9 million firm fixed-price definitive contract by the Department of Energy's National Nuclear Security Administration (ENDIST Alaska) on March 8, 2019, for construction of the Livermore Retrograde Power Plant (LPP) in Nenana, Alaska, with an ultimate completion date of May 2, 2025. The contract, designated CLR039C LPP P00064 R00065 CR00062 for NIU Integration, carries no set-aside designation. This substantial defense-related infrastructure...
- The Department of the Army Corps of Engineers awarded a $519,297.02 firm-fixed price contract to National Electric Coil, Inc. for the repair and rewind of the stator at the Beaver Powerhouse in Eureka Springs, Arkansas. The contract was awarded on September 21, 2018 and is scheduled for completion by September 30, 2019. This requirement was originally posted as a sources sought notice on January 25, 2018 to identify qualified contractors, including small businesses, to perform the work. The...
- This is a $10,150,535.45 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to Koontz Electric Company, Inc., a heavy industrial electrical contractor based in Arkansas, for the modernization and electrical installation work at the Norfork Powerhouse. The contract has a period of performance of 660 calendar days from the notice to proceed. The work involves the removal and installation of generator step-up transformers and foundations, replacement of 15 kilovolt switchgear,...
- <p>This is a federal contract awarded by the U.S. Army Corps of Engineers to Huber Contracting Inc., a self-certified small disadvantaged business and HUBZone firm, to provide caulk removal and replacement services for the FR Powerhouse located in Pickstown, South Dakota. The definitive, firm-fixed price contract has a ceiling value of $1,157,005.88 and was awarded on August 24, 2016, with a period of performance ending on May 28, 2018. The contract does not have a set-aside designation.</p>
- The U.S. Army Corps of Engineers awarded a $8,788,287.00 firm-fixed-price definitive contract to Koontz Electric Company, Incorporated, a heavy industrial electrical contractor, for the GSU Transformer Installation project at the Fort Peck Powerhouse in Montana. The project involves removing existing transformer banks and oil feeders, moving two government-furnished transformers to new locations, and installing new feeders and connections to make the equipment fully operational. This work was...
- This is a $1,690,013 definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Gracon LLC for the replacement of raw water piping at the Beaver Powerhouse in Carroll County, Arkansas. The contract has a firm fixed-price structure and an ultimate completion date of August 5, 2017. As the prime contractor, Gracon LLC has engaged several subcontractors, including Midland Thermal Inc. for PVC jacketing, Lynchburg Air Preheater Corporation for air cooler supply, and Snyder...
- This is a $17,848,028.05 definitive, firm-fixed price contract awarded by the U.S. Army Corps of Engineers to Olsson Industrial Electric, Inc. to perform electrical infrastructure modernization at the Robert S. Kerr Reservoir powerhouse. The work involves replacing aged and obsolete 15kV switchgear, 480V station service switchgear, unwatering/sump pumps and motors, transformer deluge containment, fire protection systems, governor kidney loop systems, and draft tube/spiral case valves. The...
- This is a $8,632,453.80 definitive contract awarded by the U.S. Army Corps of Engineers to GE Renewables US LLC, a subsidiary of General Electric Company, for the disassembly of Unit 5, repair of the rotor spider, finite element analysis, and turbine seal work. No set-aside was used. As a prominent federal contractor, GE Renewables has received numerous prime awards from agencies like the Bureau of Reclamation and Bonneville Power Administration to rehabilitate and maintain hydropower...
- This is a $14,622,382.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to JR Merit, Inc. to furnish and install a new stator core at the Chief Joseph Powerhouse in Bridgeport, Washington. The contract was awarded on October 1, 2022 and has an ultimate completion date of January 15, 2026. This contract was not set aside for any small business program. The original solicitation was a pre-solicitation notice that sought information from interested...
- This definitive contract, awarded by the U.S. Army Corps of Engineers to Andritz Hydro Corp, requires the company to provide materials, equipment, and services to rewind the generators of Units 1, 2, and 3 at the Webbers Falls Powerplant. The $6,109,745.28 firm fixed-price contract includes design, manufacturing, testing, and delivery of new stator coils, as well as the disassembly, removal of old coils, installation, and reassembly of the generators. This work supports the Corps of Engineers'...
LABOR AND MATERIALS FOR THE POWERHOUSE.
Posted 12/7/15
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $8.3k | 12/7/15 |