Delivery Order FA821422D0001-FA821426FB005
- Not listed
- The Boeing Company was awarded a $44.5 million firm fixed-price delivery order on November 13, 2024, for Flight Test Telemetry and Termination (FT3) production supporting the Minuteman III (MMIII) intercontinental ballistic missile program. This non-set-aside award is funded by the Air Force Materiel Command and will be performed in Layton, Utah, with an ultimate completion date of February 5, 2027. The delivery order is issued under Boeing's larger $72.2 million...
- The Boeing Company received a $38.16 million cost-plus-fixed-fee delivery order from Air Force Materiel Command on November 14, 2023, for Flight Test Telemetry and Termination (FT3) production supporting the Minuteman III (MMIII) intercontinental ballistic missile program. This delivery order, with a completion date of June 30, 2026, is issued under Boeing's existing $72.2 million indefinite-delivery/indefinite-quantity contract focused on production and sustainment of flight test telemetry...
- The Boeing Company received a $13.6 million cost-plus-fixed-fee delivery order from Air Force Materiel Command on May 24, 2023, for Flight Test Telemetry and Termination (FT3) production supporting the Minuteman III (MMIII) intercontinental ballistic missile program. Performance will be completed at Boeing's facility in Layton, Utah by September 30, 2026. This delivery order is unset-aside and represents a task order under Boeing's broader $72.2 million indefinite-delivery/indefinite-quantity...
- The Boeing Company received a $20.5 million delivery order award from Air Force Materiel Command on May 2, 2022, for Flight Test Telemetry and Termination (FT3) production supporting the Minuteman III intercontinental ballistic missile program. This cost-plus-fixed-fee delivery order, which extends through September 1, 2025, is issued under Boeing's existing $72.2 million indefinite-delivery/indefinite-quantity (IDIQ) contract with Air Force Materiel Command for FT3 equipment production and...
- The Boeing Company received a delivery order valued at $6.23 million from Air Force Materiel Command for sustainment of the guidance system for the Minuteman III intercontinental ballistic missile. The contract, awarded February 2, 2025, will be performed in Layton, Utah, with work to conclude by February 1, 2026. Priced as cost-plus-fixed-fee with no set-aside designation, this delivery order falls under Boeing's larger $1.615 billion single-award indefinite-delivery/indefinite-quantity...
- The U.S. Air Force Materiel Command awarded a $228,577 Cost Plus Fixed Fee delivery order contract to The Boeing Company for the ICBM Cryptography Upgrade (ICU) II Dose Rate Upset (DRU) Test. This work supports the Minuteman III intercontinental ballistic missile system, which is a critical component of the U.S. nuclear deterrent. Boeing, as the prime contractor, will perform engineering, maintenance, modification, and hardware/software support for the Minuteman III's guidance subsystem at its...
- The Boeing Company has been awarded a delivery order valued at $2.69M by the Air Force Materiel Command for nuclear hardness status testing on the Minuteman III guidance set. This non-set-aside contract, priced on a cost-plus-fixed-fee basis, will be performed in Layton, Utah and is scheduled for completion by September 29, 2026. The delivery order falls under Boeing's larger $1.615B single-award indefinite-delivery/indefinite-quantity (IDIQ) contract with Air Force Materiel Command for...
- This is a federal contract award to The Boeing Company, doing business as Boeing, for the sustainment of the guidance system for the Minuteman III intercontinental ballistic missile. The $6,215,742.27 award is a delivery order under an indefinite-delivery/indefinite-quantity (IDIQ) contract with the Air Force Materiel Command. The IDIQ contract, valued at $1.615 billion, provides for sustainment engineering, maintenance, modification, and hardware and software support to ensure the operational...
- The Boeing Company was awarded a definitive cost-plus-incentive contract by the Air Force Materiel Command's Nuclear Weapons Center on October 4, 2017, to provide sustaining engineering services for the Minuteman III intercontinental ballistic missile guidance system. The contract, which extends through July 31, 2026, carries a ceiling value of $220.38 million and encompasses comprehensive engineering, maintenance, modification, and hardware/software support to ensure continued operational...
- The U.S. Air Force Materiel Command awarded a $58,284,021.41 cost-plus-award-fee delivery order contract to The Boeing Company for the purpose of providing repair services for the guidance system of the Minuteman III intercontinental ballistic missile. This order is not a set-aside contract. Boeing's Defense, Space & Security division will perform the work at its facility in Heath, Ohio. As a prime contractor, Boeing has significant experience supporting the Air Force's nuclear deterrence...
- FA821422D0001Indefinite Delivery Contract
- FA821422D0001-FA821426FB005Delivery Order
The Boeing Company has been awarded a $41.4 million firm fixed-price delivery order by the Air Force Materiel Command for Flight Test Telemetry and Termination (FT3) production supporting the Minuteman III (MMIII) intercontinental ballistic missile program. This delivery order, awarded on December 3, 2025, with an ultimate completion date of March 3, 2028, will be performed at Boeing's facility in Layton, Utah. The award does not utilize a set-aside designation and represents a child contract action under Boeing's existing $72.2 million indefinite-delivery/indefinite-quantity (IDIQ) contract with Air Force Materiel Command for flight test telemetry and termination equipment production and sustainment for the Minuteman III program, which extends through April 2030. This delivery order supports the continued modernization and sustainment of the U.S. nuclear deterrent by providing critical flight test telemetry and termination systems for the Minuteman III program. Boeing's work encompasses the design, production, and delivery of specialized equipment essential to flight testing operations for this strategic weapon system. The award reflects Boeing's established role as a key contractor for Minuteman III sustainment and modernization efforts, building on the company's extensive experience performing complex engineering, testing, and production services for Air Force Materiel Command's most critical strategic systems.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $41.4m | 12/2/25 |