Definitive Contract W912QR07C0023
Award Date 5/2/07
Potential Completion Date 9/15/07
Potential Value $2.5M
Federal Agency
Awardee
Ultimate Awardee
Not listed PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
HUBZone
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Rock Island, IL 61204, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
3
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- Air Control, Inc., a woman-owned small business headquartered in Clinton, Iowa, was awarded a $6.8M firm fixed-price definitive contract by the U.S. Army Corps of Engineers on June 4, 2025, to perform flood repairs for Bay Island Drainage and Levee District No. 1 in Mercer County, Illinois. The contract, designated as a total small business set-aside, requires the contractor to execute 2023 event flood repairs consisting of placing riprap in select areas by barge, reshaping existing sand...
- The Department of the Army Corps of Engineers awarded a $795,785.92 firm fixed price definitive contract to Better By Design LLC as an 8(a) sole source set aside. The contract is for repairs to Rock Island Levee District Milan-Big Island Levee Protection Project features in Rock Island County, Illinois resulting from the 2019 flood event, including repairs to Mill Creek and Case Creek. Better By Design LLC, an SBA 8(a) and HUBZone certified small disadvantaged business, will serve as the prime...
- This is a $2,477,044.49 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers, Rock Island District (ENDIST Rock Island) to Midwest Foundation Corporation for the Peoria Riverfront Development, Illinois (Ecosystem Restoration) Upper Mid-Sized Island Critical Restoration Project, Stage I. The project is located on the Illinois Waterway in Tazewell County, Illinois. The contract has an ultimate completion date of August 26, 2013 and was awarded on March 19, 2009. This...
- This is a firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) Rock Island District to Frontier - Arrowhead, an 8(a) certified small disadvantaged business, for the Illinois River Basin Restoration project in Oswego, Kendall County, Illinois. The contract scope includes grading, shaping, and placing erosion protection for stream banks; constructing rock ramps, riffles, and bank slope protection; modifying an existing spillway and dam; and debris removal and...
- This firm fixed price contract valued at two million eleven thousand seven hundred twenty-nine dollars and forty-eight cents ($2,011,729.48) was awarded by the Department of the Army Corps of Engineers (USACE) to Lund Randy M Engineering Division doing business as Lund Engineering. The place of performance is Milan, Illinois and Rock Island, Illinois. The work includes clearing, grubbing, stripping, levee reshaping, stone placement and gate repairs for the Milan, Illinois Flood Control Project...
- This is a Firm Fixed Price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) Louisville District to URS Group, Inc., a subsidiary of AECOM, in the amount of $195,605.24. The contract is part of the USACE Louisville Environmental and Restoration Services 2011-2017 (ERSC) Indefinite Delivery/Indefinite Quantity (IDIQ) master contract, which supports the Department of Defense's Other Environmental Programs. This program encompasses various environmental compliance,...
- The U.S. Army Corps of Engineers, Chicago District awarded a $2.79 million firm fixed price definitive contract to Midwest Construction Company for the delivery of fill stone to Burns Waterway Harbor and stone to Illinois Beach State Park. The solicitation sought proposals to furnish and deliver quarter to one ton stone for Burns Harbor and IDOT RR-7 stone sized 12 pounds to 1,000 pounds for Waukegan Harbor from June 2021 through optional future delivery periods, with a daily production rate...
- The U.S. Army Garrison Rock Island Arsenal awarded a $992,391 firm fixed-price contract to Keith Frieden Excavating Inc., a small disadvantaged business based in New Boston, Illinois, for the reconstruction of the southwest patio of Quarters 1 (Building 301) at Rock Island Arsenal in Illinois. This total small business set-aside contract was awarded on August 18, 2025, with an ultimate completion date of February 11, 2026. The scope of work encompasses the reconstruction of approximately 1,000...
- The U.S. Army Corps of Engineers awarded a $79,516.14 firm fixed-price delivery order contract to Kaskaskia Engineering Group LLC of Rock Island, Illinois. The contract is for the installation of an observation well at Lock 15 to support monitoring of water levels and quality as part of the Corps' waterway infrastructure management program. No set-aside designation was applied to this award. Performance will take place in Rock Island, Illinois through the scheduled completion date of May 6,...
- The U.S. Army Corps of Engineers awarded a $468,415 firm fixed price delivery order to Ardl Inc., doing business as Applied Research & Development Labs, for work at the Old American Zinc Plant Superfund site in La Salle, Illinois. Under this order issued against an unspecified multiple award contract vehicle, Applied Research & Development Labs will provide environmental remediation and cleanup services at the contaminated former zinc smelting plant site from August 2023 through August...
FUGITIVE DUST CONTROL PROJECT ROCK ISLAND IL
Posted 5/2/07
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| A00002 | Supplemental Agreement for work within scope | $41.5k | 9/19/07 | |
| A00001 | Supplemental Agreement for work within scope | $0 | 7/18/07 | |
| Not listed | Not listed | $1.3m | 5/2/07 |