Definitive Contract W912P910C0411
Award Date 2/22/10
Potential Completion Date 3/24/12
Potential Value $6.7M
Federal Agency
Awardee
Ultimate Awardee
Not listed NAICS Category
PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Perryville, MO 63775, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a $345,935.77 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers St. Louis District to Patton-Tully Marine, LLC for river rock removal on the Upper Mississippi River in Missouri and Illinois. The contract is for Recovery Project #118736, referred to as "RIVER ROCK REMOVAL, UPPER MISSISSIPPI RIVER, MILES 46-38 AND 81-78 IN MISSOURI AND ILLINOIS." The contract does not have a set-aside designation and has an ultimate completion date of April 30,...
- This is a $4,108,614.90 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Patton-Tully Marine, LLC for revetment and bankline repairs along the Mississippi River from miles 300.0 to 0.0. The work is described as "REVETMENT / BANKLINE REPAIRS ALONG THE MISSISSIPPI RIVER MILES 300.0 TO 0.0 PROJECT NO.:118133; 118136; 334828." The contract does not have a set-aside designation and has an ultimate completion date of January 14, 2020. Patton-Tully Marine,...
- <p>This is a $1,247,202.18 Firm Fixed Price construction and maintenance contract awarded by the U.S. Army Corps of Engineers (USACE) to Patton-Tully Marine, LLC for work on the Upper Mississippi River Miles (MRM) 300-195. The contract has an ultimate completion date of July 29, 2015. This contract does not have a set-aside designation. The work is for construction and maintenance operations on the Upper Mississippi River in the USACE St. Louis District area of responsibility.</p>
- This is a definitive, firm-fixed-price contract awarded by the U.S. Army Corps of Engineers, St. Louis District, to Patton-Tully Marine, LLC, a for-profit limited liability company located in Memphis, Tennessee. The contract is for the Devils Island Reach Phase IV project, which involves work on the Upper Mississippi River between miles 75.0 and 40.0 in Cape Girardeau County, Missouri. The contract has a ceiling value of $4,499,106.50 and a completion date of October 20, 2011. The contract is...
- <p>This is a $2,588,545.60 firm fixed-price construction contract awarded by the U.S. Army Corps of Engineers, St. Louis District (ENDIST St Louis) to Patton-Tully Marine, LLC for the construction of Operation and Maintenance (O&M) activities along the Lower Mississippi River from mile 195 to 98.6 and 98.6 to 0. The contract has a period of performance through September 30, 2016 and was set aside for small businesses.</p>
- This is a $4,689,905.60 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Luhr Bros., Inc. for the Red Rock Landing Phase 4 project. The work involves graded stone structure construction, dike degradation and stone recycling, and verification surveys along the Mississippi River from river miles 104 to 101. The contract was competitively awarded under NAICS code 237990 for Other Heavy and Civil Engineering Construction, with no set-aside designation. Luhr Bros....
- <p>This is a firm fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) to Patton-Tully Marine, LLC, a limited liability company based in Memphis, Tennessee. The contract is for the construction of dikes and has a ceiling value of $5,655,945.87. The ultimate completion date is February 15, 2020. The contract does not have a set-aside designation. As this is a USACE contract, the work is likely related to the agency's civil works and flood control programs.</p>
- <p>This is a $1,649,596.90 firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers, Vicksburg District to Patton-Tully Marine, LLC, a small business, to furnish and deliver R400 riprap to Enid Lake in North Mississippi. The contract was set aside for total small business participation and has a period of performance through September 30, 2009.</p>
- <p>The Department of the Army Corps of Engineers Engineering District Memphis awarded a Firm Fixed Price Delivery Order contract to Patton-Tully Marine, LLC, a For Profit Limited Liability Company, for $3,933,402.50. The contract was awarded on June 15, 2017, with a completion date of August 13, 2018, and does not have a set-aside designation. The contract is for work to be performed in New Madrid, Missouri.</p>
- This is a firm fixed price delivery order awarded by the U.S. Army Corps of Engineers to Luhr Bros., Inc., a for-profit organization, for subaqueous paving using stone. The delivery order, valued at $20,313,099.00, was issued under an indefinite delivery/indefinite quantity (IDIQ) contract vehicle held by Luhr Bros. to provide dike and revetment construction, habitat restoration, and stone structure repairs along the Mississippi and Red Rivers. The contract does not have a set-aside designation....
This is a $6,728,303.75 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to Patton-Tully Marine, LLC for the construction of Red Rock Landing Phase V along the Upper Mississippi River. The work involves raising, removing, extending, and notching dikes, as well as constructing new dikes and weirs using graded stone. This contract is not set aside and is not associated with a larger contract vehicle. The project is part of USACE's recovery efforts along the Upper Mississippi River.
Generated 4/2/25, 9:57 AM
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
RECOVERY--Z--PROJECT NUMBER 118736, CONSTRUCTION OF RED ROCK LANDING PHASE V, UPPER MISSISSIPPI RIVER MILES 105. 0 TO 90. 0 | W912P910B0204 | Department of the Army Corps of Engineers Engineering District St Louis | Award Notice 2/2 | 3/2/10, 10:55 AM | |
RECOVERY--Z--PROJECT NO. : 118736, Red Rock Landing Phase V, Raising, Removal, Extending and Notching Dikes, Construction of Dikes Chevrons Dikes and Weirs, MRM 105. 0 to 90. 0 | W912P910B0204 | Department of the Army Corps of Engineers Engineering District St Louis | Award Notice 1/2 | 11/3/09, 1:09 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00004 | Change Order | ($106k) | 3/9/12 | |
| P00003 | Change Order | ($9) | 2/15/12 | |
| A00001 | Other Administrative Action | $0 | 10/27/11 | |
| P00002 | Change Order | $0 | 5/19/11 | |
| P00001 | Change Order | $2.7m | 4/30/10 |