Definitive Contract W912P620C0020
- Not listed
- This is a $4,940,434.50 firm fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Grimmer Construction Inc., a self-certified small disadvantaged business based in Highland, Indiana. The contract is for the Gary Sanitary District 27th & Chase Street Force Main Replacement, Phase 2 project, which involves installing approximately 1,000-1,500 feet of 48-inch diameter force main to replace the deteriorating and undersized 42-inch main. This work is being performed...
- This is a definitive contract awarded by the U.S. Army Corps of Engineers to Grimmer Construction Inc., a self-certified small disadvantaged business, to perform sewer rehabilitation work in Gary, Indiana. The $1,682,369.99 firm-fixed-price contract is set aside for small businesses and involves upgrading the Horace Mann Sewer system, including pipe lining, jacking, excavation, bypass pumping, manhole rehabilitation, and related municipal utility construction and repairs. Grimmer Construction is...
- Grimmer Construction Inc. has been awarded a firm fixed price contract valued at $5,323,600.05 by the Department of the Army Corps of Engineers, Chicago District, to replace approximately 700 linear feet of a 45-inch force main in Gary, Indiana. Under the contract, Grimmer Construction will jack bore under local highways, excavate to install new piping, and tie the replacement force main into the existing infrastructure at the 27th and Chase Street Pump Station. This project supports the Gary...
- This firm-fixed price contract was awarded by the U.S. Army Corps of Engineers - Chicago District to Grimmer Construction Inc., a self-certified small disadvantaged business, to perform the GARY SANITARY DISTRICT 32ND AVE AND ALLEY 1E FLOW IMPROVEMENTS project in Gary, Indiana. The $1,047,684.68 contract involves the construction of a new diversion structure, 60-inch pipe, and drop shaft to improve the flow of the existing 5-foot by 9-foot box sewer. This project is a total small business...
- This is a $1,244,895.00 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers, Chicago District to LGS Plumbing, Inc., a small business, for the Gary Sanitary District Force Main Replacement project in Griffith, Indiana. The contract involves the installation of new sewer pipelines, lining of existing sewer laterals, replacement of old cast iron water mains with polyvinyl chloride pipe, construction of lift stations, and related utility improvements. This contract...
- This is a definitive contract awarded by the U.S. Army Corps of Engineers to Grimmer Construction Inc., a self-certified small disadvantaged business, for the City of Crown Point Sanitary Sewer Improvements project in Crown Point, Indiana. The $2,923,127.30 firm fixed-price contract has a completion date of November 30, 2022 and was set aside exclusively for small businesses under NAICS code 237110 with a $39.5 million size standard. The contract requires the installation of new storm sewer...
- This is a $4,533,310.44 Firm Fixed Price definitive contract awarded by the U.S. Army Corps of Engineers to Grimmer Construction Inc., a self-certified small disadvantaged business, for the Lake Street Sanitary and Storm Sewer Improvements Section 219 project in Griffith, Indiana. The contract was set aside for small businesses and involves the rehabilitation, replacement, and installation of sanitary sewer lines, manholes, lift stations, water mains, storm sewers, and related municipal...
- The U.S. Army Corps of Engineers awarded a $1,160,156.17 firm fixed price definitive contract to Grimmer Construction Inc., a self-certified small disadvantaged business, for the CITY OF HOBART, 6TH STREET SANITARY SEWER IMPROVEMENTS project. This municipal infrastructure contract, set aside for small businesses, requires Grimmer Construction to rehabilitate, replace, and install new sanitary sewer lines, manholes, lift stations, and related utility systems in New Chicago, Indiana. Grimmer...
- This contract was awarded by the U.S. Army Corps of Engineers to Grimmer Construction Inc., a self-certified small disadvantaged business located in Highland, Indiana. The $2,995,370.00 fixed-price contract is for stormwater infrastructure improvements in Hammond, Lake County, Indiana. The work involves installing approximately 1,630 linear feet of 54-inch storm sewer pipe to increase the capacity to convey stormwater from the Dowling Park neighborhood. The original solicitation was a full and...
- This firm fixed price contract valued at one million twelve thousand four hundred eighty-one dollars and fifty cents ($1,012,481.50) was awarded by the Department of Defense Army Corps of Engineers (USACE) to Grimmer Construction Inc. to provide sanitary sewer improvements in Crown Point, Indiana. The scope of work under this contract includes the installation of approximately 700 feet of 8-inch, 400 feet of 10-inch, and 6,500 feet of 12-inch cured-in-place pipe liner, rehabilitation of up to 40...
This definitive contract was awarded by the U.S. Army Corps of Engineers to Grimmer Construction Inc. for approximately $2.76 million. Under the contract, Grimmer Construction will replace around 2,030 linear feet of compromised sanitary sewer lines located along 13th Avenue in Gary, Indiana. Specifically, the firm will replace existing sewer lines ranging from 30 to 48 inches in diameter with reinforced concrete pipes of the same size and slope. Additional work includes installing nine new manholes, removing existing infrastructure, conducting dewatering and bypass pumping, and repairing pavement. The funding agency, the Department of the Army Corps of Engineers, issued the solicitation to replace the sewer lines as part of its civil works program. This contract has been set aside exclusively for small businesses and falls under North American Industry Classification System code 237110 for sanitary sewer line replacement projects.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
GARY SANITARY DISTRICT 13TH AVENUE SANITARY SEWER REPLACEMENT - SECTION 219, GARY, LAKE COUNTY, INDIANA (USACE ACQUISITION) | W912P620B0019 | Department of the Army Corps of Engineers Engineering District Chicago | Solicitation 2/3 | 8/7/20, 6:39 PM | |
GARY SANITARY DISTRICT 13TH AVENUE SANITARY SEWER REPLACEMENT - SECTION 219, GARY, LAKE COUNTY, INDIANA (USACE ACQUISITION) | W912P620B0019 | Department of the Army Corps of Engineers Engineering District Chicago | Pre-Solicitation 1/3 | 6/2/20, 6:49 PM | |
GARY SANITARY DISTRICT 13TH AVENUE SANITARY SEWER REPLACEMENT - SECTION 219, GARY, LAKE COUNTY, INDIANA (USACE ACQUISITION) | W912P620C0020 | Department of the Army Corps of Engineers Engineering District Chicago | Award Notice 3/3 | 10/2/20, 3:36 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| A00002 | Supplemental Agreement for work within scope | $0 | 12/1/21 | |
| A00001 | Change Order | $9.0k | 6/14/21 | |
| P00001 | Funding Only Action | $1.1m | 4/6/21 | |
| Not listed | Not listed | $1.6m | 9/27/20 |