Definitive Contract W912EF16C0037
Award Date
9/21/16
Potential Completion Date
8/17/18
Potential Value
$7.6M
Overview
🤔 AI Insights
Buyer Personas
Industry Personas
Buyer Personas In this Market
108
Activity
13
Transactions
25
Subawards
Opportunity Stack
1
Federal Agency
ENDIST Walla Walla
Awardee
Advanced American Construction, Inc.
Ultimate Awardee
Not listed
NAICS Category
237990 - Other Heavy and Civil Engineering Construction
PSC Category
Z2KA - Repair Or Alteration Of Dams
Federal Contract Vehicle
Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Pomeroy, WA 99347, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Description
Update #1
LOWER GRANITE JFF PHASE 1B OUTFALL RELOCATION-POMEROY, WA
Posted 9/22/16, 12:00 AM
Name
Description
Solicitation Number
Federal Agency
Type
Posted Date
(Click to sort descending)
Lower Granite Lock and Dam JFF Phase 1b Outfall Relocation Solicitation
Added: Jun 03, 2016 1:59 pm SYNOPSIS:Construction Project: Lower Granite Lock and Dam JFF Phase 1(b) Outfall RelocationThis will be a firm fixed-price construction contract located at Lower Granite Lock and Dam in Pomeroy, Washington. Estimated construction magnitude is between $5,000,000 and $10,000,000. Performance and payment bonds (100%) will be required. The in water work window is expected to be 15 November 2016 through 28 February 2017. See solicitation for details.DESCRIPTION OF WORK:The purpose of this work is to construct the final length of the Outfall pipe at Lower Granite Lock and Dam, Pomeroy, WA.This work will be constructing beginning from the pipe interface endpoint from Phase 1a contract to the middle of river. There are 11 in-water piers and about 600 feet of 36 inch pipe (the last 160 feet has a corrugated liner). The majority of the work is in/above the water; piers will be installed as drilled shafts from a floating plant (approx 60-70 feet deep). The project also includes a walkway and handrail along the length of the pipe; bird deterrent sprinkler, piping and pump; kelt tank truck ramp, fencing revision, and gate addition; and connecting pipes from the JFF to the new outfall discharge pipe. The in-water work must be performed during the in-water work window (see above) and bypass and connecting pipe must be completed and ready for service by March 1, 2017. See solicitation for details.All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with OSHA and State Regulations, EM 385-1-1, and ASSE/SAFE A10.32 and ASSE/SAFE Z359.A qualified Fall Protection Competent Person shall be provided by the Contractor for each shift of the contractor's on-site operations that involves work that exposes workers to fall hazards.This contract will require the Contractor to furnish mobile crane equipment, crane operators, and rigging equipment that comply with the certification and testing requirements of EM 385-1-1 as well as all applicable OSHA requirements.The Contractor will be responsible for various equipment to support elevated working positions such as scaffolding, scissor-lifts, and boom-lift equipment.The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award.The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.Miscellaneous work within the project includes the delivery of As-Built Drawings to the customer.Request for Proposal No. W912EF-16-R-0039 will be posted to the FedBizOpps (FBO) website approximately near the end of June 2016. Proposals will be due no sooner than 30 calendar days after the solicitation is issued. When issued, the solicitation documents for this project will be available at https://www.fbo.gov. The solicitation is 100% set-aside for small business concerns. The small business size standard for NAICS 237990 is no more than $36,500,000 in average annual receipts.Important Note:The FBO Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual bid opening date. The bid opening date and time will be contained in the solicitation and any solicitation amendments that are issued.A site visit will be offered generally within 2 weeks after the solicitation is issued. The site-visit is HIGHLY recommended if a bid is intended. See solicitation for details about the site visit. Only ONE site visit will be offered.Access for Foreign Nationals. It takes from 30 days to obtain clearance for foreign nationals to enter the project site. If your company wishes to have a foreign national participate in the site visit for this project, you are strongly encouraged to submit the required identification immediately. To request clearance for foreign nationals, submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph 9INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to cynthia.h.jacobsen@usace.army.mil. Foreign nationals must have received clearance prior to being granted access to the project site.No CDs or hard copies will be available by the Government. Downloads are available only through the FBO website. Bidders are responsible for checking the FBO website frequently for any update(s) to the notice. The Government is not responsible for any loss of internet connectivity or for a bidder's inability to access the document posted on the referenced website. To obtain automatic notifications of updates to this solicitation, you must log in to www.fbo.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation.
W912EF-16-R-0039
Department of the Army Corps of Engineers Engineering District Walla Walla
Award Notice 1/1
6/3/16, 1:59 PM
Mod #
Description
Reason For Modification
Federal Obligation
(Click to sort descending)
Date
(Click to sort ascending)
A00024
JFF PIPING MODIFICATIONS
Supplemental Agreement for work within scope
($2k)
2/27/20
A00022
MODIFICATION A00022 - PVC FITTINGS & EXP JOINTS DEFIN (CR015-4)
Supplemental Agreement for work within scope
$47.1k
9/29/18
A00023
MODIFICATION A00023 - DEFIN CM LINER REMOVAL (CR016-3)
Supplemental Agreement for work within scope
$54.7k
9/29/18
A00021
REA PIER 104 EXPLORATORY DRILLING (CR019)(A00021)
Change Order
$39.2k
8/17/18
A00020
DFB REROUTE (DEFIN)(CR017-2); BT PIPE PEN REPAIR (DEFIN) (CR018-2)(A00020)
Supplemental Agreement for work within scope
$73.8k
8/9/18