Definitive Contract W912DW21C0019

Award Date 10/16/21
Potential Completion Date 2/28/22
Potential Value $1.4M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Seattle
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Everett, WA 98201, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
4
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The U.S. Army Corps of Engineers awarded a $3,364,714.00 firm-fixed-price contract to HME Construction Inc., a small business Alaskan Native Corporation, for FY24 clamshell dredging of the Snohomish River in Everett, Washington. This project involves removing approximately 250,000 cubic yards of accumulated sediment from the Everett Harbor and Snohomish River federal navigation channel, with the dredged material placed at the Port Gardner open water disposal site. The work is scheduled to be...
This firm-fixed-price contract was awarded by the U.S. Army Corps of Engineers, Seattle District to Portable Hydraulic Dredging LLC, a Native American-owned small disadvantaged business, to perform hydraulic maintenance dredging of the Snohomish River Federal navigation channel in Everett, Washington. The contract has a potential value of $1,547,280.60 and required the contractor to dredge approximately 140,000 cubic yards of sediment from the Upper Settling Basin and the Federal channel...
This $1.492 million firm fixed price contract was awarded by the Department of the Army Corps of Engineers, Seattle District, to JE McCamis Inc. for maintenance dredging of approximately 160,000 cubic yards of sediment from three areas of the Snohomish River Federal Navigation Channel in Everett, Washington. The solicitation sought a contractor to perform the dredging using a mechanical clamshell dredge between October 16, 2020 and February 14, 2021, with disposal at the Port Gardner open...
The U.S. Army Corps of Engineers awarded a $1,493,684.00 firm-fixed price contract to American Construction Co., Inc., a small business subchapter S corporation, for FY22 dredging and disposal services in the Snohomish River Federal navigation channel in Everett, Washington. The contract, which is set aside for small businesses, requires clamshell dredging of approximately 150,000 cubic yards of sediment and placement at the Port Gardner open water disposal site. All in-water work must be...
This is a firm-fixed-price contract awarded by the U.S. Army Corps of Engineers, Seattle District (ENDIST Seattle) to Portable Hydraulic Dredging LLC, a Native American-owned small disadvantaged business, for FY17 Everett Harbor dredging. The contract has a ceiling value of $1,546,049.00 and a completion date of March 28, 2018. The contract was set aside for small businesses. Portable Hydraulic Dredging LLC specializes in hydraulic dredging services and has been awarded similar contracts by...
This is a firm-fixed-price contract awarded by the U.S. Army Corps of Engineers, Seattle District, to Portable Hydraulic Dredging LLC, a Native American-owned small disadvantaged business, for FY16 EVERETT DREDGING. The contract has a ceiling value of $1,225,756.00 and an ultimate completion date of March 1, 2017. The contract does not have a set-aside designation. The contract requires the contractor to perform hydraulic dredging to remove sediment from federal navigation channels, rivers,...
The U.S. Army Corps of Engineers, Seattle District awarded American Construction Co., Inc. a $1,020,830 firm-fixed-price contract to remove approximately 100,000 cubic yards of accumulated sediment from two segments of the Duwamish River navigation channel in Seattle, Washington. Under the terms of the contract, American Construction will utilize a mechanical clamshell dredge to remove sediments, load them onto bottom dump barges, and transport the materials to the Elliott Bay Open Water...
This is a firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE), Seattle District to American Construction Co., Inc., a small business subchapter S corporation, for Duwamish Turning Basin dredging and disposal services in Seattle, Washington. The contract has a ceiling value of $757,803.00 and a period of performance through March 29, 2024. This contract was awarded under a small business set-aside solicitation (W912DW-23-B-0007) for Other Heavy and Civil...
This is a firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers (USACE) to HME Construction Inc., a small business Alaskan Native Corporation-owned firm, for $1,208,004.70. The contract is for FY15 Everett Harbor maintenance dredging, a project to remove sediment from the harbor to maintain minimum navigation depths. This is a set-aside contract for small businesses, with a period of performance through March 1, 2016. HME Construction Inc. is a marine construction...
This is a fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to American Construction Co., Inc., a small business subchapter S corporation, for the Swinomish Maintenance Dredging project in La Conner, Washington. The contract has a ceiling value of $3,664,950.00 and a completion date of March 1, 2025. The project involves removing up to 180,000 cubic yards of accumulated sediment from the Swinomish Channel Federal navigation channel using a clamshell dredge. The...

The U.S. Army Corps of Engineers, Seattle District awarded Duwamish-Pacific Joint Venture a $1.4 million firm-fixed-price contract to perform maintenance dredging of the Snohomish River Federal Navigation Channel in Everett, Washington. Under the terms of the contract, the contractor will remove approximately 140,000 cubic yards of sediment via hydraulic pipeline dredge between October 16, 2021 and February 28, 2022, placing the material at the Parcel O and Jetty Island upland disposal sites. This contract was awarded pursuant to a competitive solicitation seeking proposals to dredge the lower channel from Station 89+50 to 115+00 and upper channel from Station 337+07 to 354+47, with no set-aside designation. The funding agency is the Department of the Army Corps of Engineers.

Generated 12/29/23, 2:21 PM