Definitive Contract W912DW19C0013

Award Date 8/12/19
Potential Completion Date 3/17/21
Potential Value $6.9M
Funding Federal Agency
Bonnevile Power Administration
Contracting Federal Agency
ENDIST Seattle
Ultimate Awardee
Not listed
Set-Aside Type
No Set-Aside Used
Federal Contract Vehicle
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Bridgeport, WA 98813, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
2
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
This is a $25,142,307.86 definitive, firm-fixed-price contract awarded by the Department of Energy Bonneville Power Administration to Knight Construction & Supply, Inc. for the Chief Joseph Dam Spillway Gates Lifecycle Maintenance project. The contract is set aside for small businesses. Knight Construction & Supply, a heavy industrial construction company, will perform dam maintenance and construction services, including turbine runner cavitation repair, crane rehabilitation, and...
This federal contract award, valued at $10,295,221.82, was issued by the Bonneville Power Administration (BPA), a civilian agency under the U.S. Department of Energy, to Pick Electric, Inc., a small business contractor. The contract is for the replacement of motor control centers SU1-SU4 at the Chief Joseph Dam, a major hydroelectric facility managed by the U.S. Army Corps of Engineers. The project aims to upgrade the aging 480V station service system, including replacing switchgear,...
This $18,413,893.00 definitive, firm-fixed-price contract was awarded by the Bonneville Power Administration, a civilian federal agency, to Olsson Industrial Electric, Inc., a for-profit, foreign-owned company based in Springfield, Oregon. The contract is for the replacement, demolition, installation, and/or refurbishment of isolated phase bus sections at the Chief Joseph Dam in Bridgeport, Washington. This work was originally solicited through a pre-solicitation notice by the U.S. Army Corps of...
The Department of Energy's Bonneville Power Administration awarded a $270,590.50 firm fixed price purchase order to Schuler Bros. Investments, Inc. Alexander GOW Fire Equipment Co Division for fire extinguisher inspection and maintenance services at Chief Joseph Dam in Bridgeport, Washington. The solicitation sought these services to comply with NFPA 10 requirements for approximately 300 carbon dioxide, dry chemical, and Class D fire extinguishers located at the dam. A small business...
This is a $163,233,922.66 firm fixed-price contract awarded by the Bonneville Power Administration, a civilian agency within the Department of Energy, to GE Renewables US LLC to rehabilitate and rewind 16 generator units at the Chief Joseph Dam in Washington state. The contract does not have a set-aside designation. Key aspects of the work include disassembling and reassembling the generators, removing and installing new stator windings, replacing generator air coolers, and installing a new...
This is a $6,469,714.00 firm-fixed price contract awarded by the U.S. Army Corps of Engineers Seattle District to Northbank Civil and Marine, Inc., a small business subchapter S corporation, to replace spillway sump pumps and controls at the Chief Joseph Dam in Bridgeport, Washington. The original solicitation, which had a potential value between $1 million to $5 million, was for a construction project to remove and replace two vertical line shaft pumps, six submersible pumps, associated...
The U.S. Bonneville Power Administration (BPA), a civilian federal agency, awarded a firm-fixed-price purchase order contract to RJ Engineering Systems, Inc., a minority-owned small disadvantaged business, for $654,678.20. The contract is for the provision of mechanical materials, piping, and fittings at the Chief Joseph Dam, with a performance location in Bridgeport, Washington. The contract was set aside for total small business participation and has an ultimate completion date of August 7,...
This contract was awarded by the Department of Energy Bonneville Power Administration to Koontz Electric Company, Incorporated, a diversified heavy industrial electrical contractor based in Morrilton, Arkansas. The $5,567,919.00 Firm Fixed Price Definitive Contract is for upgrades to the Chief Joseph Dam's direct current (DC) preferred alternating current (AC) systems. The contract does not have a set-aside designation. Koontz Electric has experience as a prime contractor providing electrical...
This federal contract award, valued at $8,173,172.00, was issued by the U.S. Army Corps of Engineers (USACE) to JR Merit, Inc. for the rehabilitation of the Chief Joseph Dam Powerhouse drainage and unwatering sump, pumps, motors, and controls. The contract involves replacing piping, valves, pumps, controls, lighting, access equipment, and structures. There was no set-aside designation for this award. The original contract opportunity, posted in February 2024, sought information from interested...
This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers Engineering District Portland to the prime contractor Knight Construction & Supply, Inc. (doing business as Knight Construction & Supply) for the installation of new governor controls and accessories. The potential value of the contract is $796,401.00. The contract does not have a set-aside designation. Knight Construction & Supply is a heavy industrial construction company that specializes in dam...

The U.S. Department of Energy Bonneville Power Administration awarded a $6,899,740 firm fixed price contract to Knight Construction & Supply, Inc. to install a new high pressure CO2 system and modernize an existing CO2 fire suppression system at the Chief Joseph Dam in Bridgeport, WA. The contract, which does not have a set-aside designation, was awarded on August 12, 2019 with a completion date of March 17, 2021. Major subcontractors include Extreme Coatings Inc. for industrial painting, Code Unlimited LLC for engineering and building & fire code services, and Johnson Controls Fire Protection LP for the modernization of the CO2 system and installation of a new water mist fire suppression system. This contract supports the Bonneville Power Administration's mission to maintain and upgrade critical infrastructure at hydroelectric facilities in the Pacific Northwest.

Generated 3/22/24, 12:16 AM