Definitive Contract W912DW15C0006
Award Date
4/30/15
Potential Completion Date
2/13/18
Potential Value
$59M
Overview
🤔 AI Insights
Buyer Personas
Industry Personas
Buyer Personas In this Market
218
Activity
Transactions
8
Subawards
34
Opportunity Stack
1
Federal Agency
ENDIST Seattle
Awardee
RQ Construction, LLC
Ultimate Awardee
Not listed
NAICS Category
236220 - Commercial and Institutional Building Construction
PSC Category
Y1AZ - Construction Of Other Administrative Facilities And Service Buildings
Federal Contract Vehicle
Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Full and Open Competition
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
LEWIS MCCHORD, WA 98433, USA
Solicitation Procedures
Two Step
Number Of Offers Received
23
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Description
Update #1
CONSTRUCTION OF FY13 SOF BATTALION OPERATIONS FACILITY.
Posted 5/7/15, 12:00 AM
Name
Description
Solicitation Number
Federal Agency
Type
Posted Date
(Click to sort descending)
FY13 SOF Battalion Operations Facility, Project 69445, Joint Base Lewis-McChord, WA
Added: Jan 14, 2013 5:12 pm POINT-OF-CONTACT: The point-of-contact for administrative or contractual questions is Kevin Mulvihill at email: Kevin.T.Mulvihill@usace.army.mil). Please no phone calls. All questions must be submitted in writing to the above point-of-contact. The U.S. Army Corps of Engineers, Seattle District (NWS) intends to issue a Two-Phase Design- Build (DB) for the design and construction of the FY13 SOF Battalion Operations Facility, Project 69445, located at Joint Base Lewis-McChord (JBLM), Washington. Response to this acquisition is Unrestricted---Open to both Large and Small Businesses and will be issued as a Two Phase Request for Proposal which will result in the award of a single Firm Fixed Price (FFP) Design-Build Construction contract. Phase 1 of the Solicitation will be available on or about 29 January 2012 on the Federal Business Opportunities (FBO) website at www.fbo.gov. The Phase 1 Proposals will be due approximately 30 days later. The solicitation, including any amendments, shall establish the official proposal due dates, times, mailing address and location for delivery. Primary facilities are a Special Operation Forces (SOF) Battalion Operations (BnOps) complex. The BnOps is a standard-design two-story consolidated Battalion Headquarters with a four-Company Operations Facility (COF) including hardstand with integrated overhead protection (gross area of 124,000 square feet) to be constructed in the East Compound. The new building will have a 44-foot setback from the existing structure. Two Deployment Equipment Storage Buildings (DESBs) (gross area of 12,000 square feet) are included to support FY13 BnOps and FY12 COF facilities with associated hardstand and loading/service areas. Additional facilities include a small Battalion Tactical Equipment Maintenance Facility (TEMF), Military Working Dog (MWD) Kennel, Communications Data Center, Tactical Unmanned Aerial Vehicle (TUAV) Facility, and a Maintenance Facility. The TEMF facility (12,500 gross square feet) includes oil and hazardous storage buildings, an area for open storage of classified information, and the secure organizational vehicle parking required for tactical vehicles and loading/service areas (32,000 square yards). The parking and its fencing will match the existing pavement and tie into the existing fencing of the adjacent TEMF and organizational parking area. The MWD Kennel consists of a single-story building (minimum 12,000 gross Square feet) with 18 kennels (24 kennels are preferred) which will replace the existing facility (building 9988) in the East Compound. The existing facility, which is used jointly by the Rangers, will be demolished as part of this project after new facilities have been constructed for both the 1st SFG (A) and Rangers. The new facility will connect to an indoor/outdoor kennel and an adjacent exterior training yard with an obedience course and individual exercise areas for canines. Associated POV parking will be provided, along with a secured outdoor storage area and secured explosive storage container. The training complex will be located within a secured 8-foot chain-link perimeter fence, screened with vertical inserts in all areas. The break area, exercise area, and obedience course will also be fenced, with the exterior fence buried a minimum of 6 inches below grade. The explosive storage container will be enclosed within an 8-foot chain-link fence, but will not be screened on any side facing the administration building. The Communications Data Center consists of a 40 x 48-foot building (gross area 1920 square feet) with a vault below in the West Compound. Six-foot chain link fencing will be provided around the building and exterior equipment will be placed a minimum of 20 feet from the building walls and will comply with Standard Fence Drawing STD 872-90-03. A pedestrian gate and a 12-foot gate for vehicle access will be provided. The TUAV facility includes a single-story maintenance, administrative, and operations facility (9,510 square feet) in the East Compound. The Maintenance Facility will replace an existing facility within the SFG East Compound; the existing woodshop facility will be demolished as part of this Project and its functions relocated in the Logistics Center as a single-story facility (7,960 square feet). The project site is located on JBLM requiring an enhanced emphasis on construction site and contractor lay down area 'housekeeping' activities, standards, and procedures will be required year-round, throughout construction. The estimated overall period of performance for this acquisition is 730 calendar days from the issuance of Notice to Proceed (NTP). The Government will accept proposals from all offerors that qualify under NAICS code 236220. The design and construction costs limitation (CCL) will be subject to the funds available for this project. The total contract award shall not exceed an estimated $40,487,000.00 for this contract. The exact amount of the CCL will be established, updated and posted in the Phase 1 Solicitation. This announcement serves as the advance notice for this project. To view or download the solicitation requires registration at the Federal Business Opportunities (FBO) website at www.fbo.gov. Downloads are available only through the FBO website. The Government will post the RFP and specifications on the FBO site and it will be password protected. Any amendments will only be available from the FBO website. Offerors are responsible for checking the FBO website frequently for any update(s) to this Pre-Solicitation Announcement or amendments to the Solicitation. The website is occasionally inaccessible due to maintenance. The Government is not responsible for any loss of internet connectivity or for an offerors inability to access the document(s) at the referenced website. POINT-OF-CONTACT: The point-of-contact for administrative or contractual questions is Kevin Mulvihill at email: Kevin.T.Mulvihill@usace.army.mil). Please no phone calls. All questions must be submitted in writing to the above point-of-contact. Contracting Office Address: USACE District, Seattle, ATTN: CENWS-CT, PO Box 3755, Seattle, WA 98124-3755 Place of Performance: Joint Base Lewis-McChord, Pierce County, WA
W912DW-13-R-0014
Department of the Army Corps of Engineers Engineering District Seattle
Award Notice 1/1
1/14/13, 5:12 PM
Contract Number
Description
Subcontractor
Prime Award
Dollars Obligated
(Click to sort descending)
Updated At
(Click to sort ascending)
130202072S
Visual Display Wall Panels
Brite Visual Products, Inc.
Definitive Contract W912DW15C0006
$37.5k
4/20/17
130202067S
Asphalt Paving
Stripe Rite, Inc.
Definitive Contract W912DW15C0006
$32.8k
2/16/17
130202066S
Final Cleaning and Window Treatments
Bovill Industries LLC
Definitive Contract W912DW15C0006
$47.9k
2/10/17
130202064S
Office Furniture
RAL Investment Corporation
Definitive Contract W912DW15C0006
$1.4m
1/9/17
130202062S
Weapon Racks
Diversification, Inc.
Definitive Contract W912DW15C0006
$323.0k
1/9/17
Mod #
Description
Reason For Modification
Federal Obligation
(Click to sort descending)
Date
(Click to sort ascending)
A00024
CONTRACT FOR FY13 MCA PN69445 SPECIAL OPERATION FORCES (SOF) BATTALION OPERATIONS (BNOPS) COMPLEX JOINT BASE LEWIS MCCHORD (JBLM) WASHINGTON AT JOINT BASE LEWIS-MCCHORD (JBLM), WA. REFERENCE NO. R00024 FL023 COMMISSIONING SPEC CHANGE
Supplemental Agreement for work within scope
$50.6k
12/22/16
A00023
CONTRACT FOR FY13 MCA PN69445 SPECIAL OPERATION FORCES (SOF) BATTALION OPERATIONS (BNOPS) COMPLEX JOINT BASE LEWIS MCCHORD (JBLM) WASHINGTON AT JOINT BASE LEWIS-MCCHORD (JBLM), WA. REFERENCE NO. R00023 FL019 BOF ELECTRICAL/COMM CHANGES
Supplemental Agreement for work within scope
$77.9k
9/22/16
A00021
CONTRACT FOR FY13 MCA PN69445 SPECIAL OPERATION FORCES (SOF) BATTALION OPERATIONS (BNOPS) COMPLEX JOINT BASE LEWIS MCCHORD (JBLM) WASHINGTON AT JOINT BASE LEWIS-MCCHORD (JBLM), WA. REFERENCE NO. R00022 FL022 PRECAST SILLS
Supplemental Agreement for work within scope
$92.6k
9/13/16
A00018
CONTRACT FOR FY13 MCA PN69445 SPECIAL OPERATION FORCES (SOF) BATTALION OPERATIONS (BNOPS) COMPLEX JOINT BASE LEWIS MCCHORD (JBLM) WASHINGTON AT JOINT BASE LEWIS-MCCHORD (JBLM), WA. REFERENCE NO. R00019 FL020 MWDK SOIL
Supplemental Agreement for work within scope
$71.1k
6/29/16
A00015
CONTRACT FOR FY13 MCA PN69445 SPECIAL OPERATION FORCES (SOF) BATTALION OPERATIONS (BNOPS) COMPLEX JOINT BASE LEWIS MCCHORD (JBLM) WASHINGTON AT JOINT BASE LEWIS-MCCHORD (JBLM), WA. REFERENCE NO. R00016 FL014 MWDK ELECTRICAL CHANGES
Supplemental Agreement for work within scope
$28.6k
5/10/16