- The Department of the Army Corps of Engineers Engineering District Omaha awarded a firm fixed price purchase order to Koontz Electric Company, Incorporated, a diversified heavy industrial electrical contractor, to provide a new vacuum circuit breaker switchgear. The potential value of the contract is $2,821,199.81, and the work is to be performed in Pierre, South Dakota. Koontz Electric has extensive experience as a prime contractor on federal contracts with the Army Corps of Engineers,...
- This contract was awarded by the U.S. Army Corps of Engineers, Omaha District to Koontz Electric Company, Incorporated, a for-profit electrical contractor located in Morrilton, Arkansas. The $10,342,033.00 firm-fixed-price contract is for the installation of a transformer at Fort Randolph, South Dakota. The original solicitation was a pre-solicitation notice for a small business set-aside contract for aerial vegetation control spraying along the Missouri River in North Dakota, South Dakota,...
- This is a $4,409,672.00 firm-fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers to Koontz Electric Company, Incorporated, a small business, for the supply and installation of approximately twenty-one motor control centers and five panel boards at the Fort Randall Powerhouse in Pickstown, South Dakota. The contract was awarded on August 10, 2020 and has a completion date of January 31, 2024. The original solicitation was a sources sought notice issued by the USACE...
- The U.S. Army Corps of Engineers, Omaha District, awarded a $1.878 million firm fixed-price definitive contract to Schuman Electric LLC on September 5, 2025, to replace DC and low voltage panel boards at Gavins Point Dam in South Dakota. The contract is set aside for total small business participation and carries an ultimate completion date of April 28, 2027, with the place of performance in Crofton, Nebraska. Schuman Electric LLC is a self-certified small disadvantaged, woman-owned small...
- This federal contract was awarded by the Department of the Army Corps of Engineers to Knight Construction & Supply, Inc. for the installation of new digital governor controls and accessories at the Gavins Point Dam near Yankton, South Dakota. The original solicitation was an unrestricted procurement with an estimated construction cost between $2,500,000 and $5,000,000. The 3-year, Firm Fixed Price contract has a potential value of $3,839,142.00. Knight Construction & Supply, Inc. is...
- The U.S. Army Corps of Engineers awarded a $4,242,734 firm fixed price purchase order contract to Koontz Electric Company, Inc. to supply and install motor control centers at the Big Bend Dam in Fort Thompson, South Dakota. The contract has no set-aside designation. This contract was awarded under a larger indefinite delivery vehicle that Koontz Electric holds with the Army Corps of Engineers, valued at $49 million, to provide electrical rehabilitation and replacement services across the...
- The U.S. Army Corps of Engineers awarded a $5.7 million firm fixed-price definitive contract to Gardner Zemke Co on October 1, 2023, for the replacement of switchyard disconnect switches at Oahe Dam in Pierre, South Dakota. This project encompasses the replacement of 40 manual switches, 13 motorized disconnects, and 15 grounding switches across the facility's 115-kilovolt and 230-kilovolt yards, along with associated infrastructure including suspension insulators, bus sections, and cables. The...
- This is a $4,352,675.00 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers to Koontz Electric Company, Incorporated for the John Day 500kV Disconnect Replacement project. The contract scope involves replacing four existing 500kV group-operated disconnect switches at the John Day Dam in Oregon and Washington with new motorized group-operated disconnect switches with surge resistors and manual grounding switches. The contract also includes installation of new control cables,...
- This contract was awarded by the U.S. Army Corps of Engineers to Koontz Electric Company, Incorporated, a diversified heavy industrial electrical contractor based in Morrilton, Arkansas. The $6,134,975 firm fixed-price contract is for the installation of an oil containment system and modifications to transformer B at the Fort Peck project in Montana. The work involves installing a new outdoor station service transformer, relocating an existing transformer, and replacing four 4160V switchgear...
- This is a firm fixed-price purchase order award from the Department of the Army Corps of Engineers Engineering District Omaha to the Canadian Commercial Corp, a prime contractor owned by the Government of Canada. The contract is for the supply and installation of Gavins Point excitation systems, including designing, manufacturing, shipping, delivering, installing, commissioning, testing, and preparing for operation of three complete static excitation systems at the Gavins Point Dam powerhouse in...
The Department of the Army Corps of Engineers Engineering District Omaha awarded a $856,658.00 firm fixed price definitive contract to Koontz Electric Company, Incorporated to replace 12 switches/hardware and disconnect switches at the Gavins Point Dam in Yankton, South Dakota. This contract was not set aside for small businesses. The original solicitation, Solicitation No. W9128F18B0009, called for the upgrade of the transmission line and generator bays at the Gavins Point Powerhouse Switchyard by replacing 18 high-voltage disconnect switches and associated equipment. The contract required the contractor to commence work within 10 days of the notice to proceed and complete the work within 410 calendar days. Koontz Electric Company, Incorporated is an experienced heavy industrial electrical contractor that has previously received prime contracts from the Army Corps of Engineers for electrical system upgrades and replacements at various hydroelectric facilities.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
Install Switchyard Disconnect Switches Gavins Point | W9128F18B0009 | Department of the Army Corps of Engineers Engineering District Omaha | Solicitation 1/1 | 7/20/18, 11:27 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Other Administrative Action | $0 | 11/28/18 | |
| Not listed | Not listed | $856.7k | 9/22/18 |