Definitive Contract W9123621C5014

Award Date 3/24/21
Potential Completion Date 2/23/22
Potential Value $5.9M
Funding Federal Agency
US Army Corps of Engineers
Contracting Federal Agency
ENDIST Norfolk
Ultimate Awardee
Not listed
Set-Aside Type
Total Small Business
Federal Contract Vehicle
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
Portsmouth, VA 23703, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
3
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The Department of the Army Corps of Engineers, Norfolk District awarded a $5,560,454.32 firm fixed-price contract to Coastal Design & Construction, Inc., a small business, to construct a new spillbox at the Craney Island Dredged Material Management Area in Portsmouth, Virginia. The contract involves the demolition of the existing spillbox and the installation of a new steel frame and panel face concrete pad spillbox along with associated pipelines. This effort is part of the Corps of...
This is a firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to Joint Forces Construction, L.L.C., a self-certified small disadvantaged, veteran-owned, and service-disabled veteran-owned business. The contract, valued at $4,127,371.63, is for site improvements at the Craney Island Dredged Material Management Area (CIDMMA) in Norfolk, Virginia. The work includes partial demolition of an existing 100-foot-wide by 30-foot-tall by 30-foot-thick steel and concrete spillbox,...
The Department of the Army Corps of Engineers awarded a $5.2 million firm fixed price contract to NDN CHC JV, LLC for Craney Island Sand Reclamation Dredging services in Portsmouth, Virginia. Under the contract, the prime contractor will mobilize equipment, reclaim up to 500,000 cubic yards of dredged material, pump carrier water, conduct surveys, and construct a containment dike at the Craney Island Dredged Material Management Area. The solicitation was a 100% small business set-aside issued...
This firm fixed-price delivery order was awarded by the U.S. Army Corps of Engineers to Coastal Design & Construction, Inc., a for-profit organization, to provide marine construction services at the Craney Island Dredged Material Management Area (CIDMMA) in Portsmouth, Virginia. The $1,270,737.32 contract does not have a small business set-aside designation. Coastal Design & Construction, Inc. has extensive experience as a prime contractor for the Army Corps of Engineers and National...
The Department of the Army Corps of Engineers, Civil Works awarded a $1,010,493 firm fixed price contract to Marine Contracting Corporation. The contract is for construction of a new fender system for the Craney Island Bulkhead in Portsmouth, Virginia. Per the original solicitation, the contractor will demolish the existing timber pile system and install a new 16-inch diameter, approximately 52.5 foot long timber pile system along 310 feet of bulkhead. The contract has a period of performance...
This is a firm fixed-price delivery order awarded by the U.S. Army Corps of Engineers to Coastal Design & Construction, Inc., a for-profit corporation, to perform work at the Craney Island Dredged Material Management Area (CIDMMA) in Portsmouth, Virginia. The contract has a potential value of $852,439.70 and a completion date of May 21, 2021. Coastal Design & Construction, Inc. has completed over $90 million in federal contracts since 2019, primarily with the Army Corps of Engineers...
This firm-fixed-price delivery order was awarded by the U.S. Army Corps of Engineers (USACE) to Coastal Design & Construction, Inc., a for-profit small business based in Gloucester, Virginia. The $2,237,903.78 contract is for the Craney Island Dike Improvements, Task Order 1, with a performance period through November 6, 2018. This contract supports USACE's coastal infrastructure and ecosystem restoration efforts in the Hampton Roads region. Coastal Design & Construction has...
This is a federal contract award under an 8(a) sole source set-aside, awarded by the U.S. Army Corps of Engineers (USACE) to Z Corp., a small disadvantaged business, for the replacement of Spillbox #3 at the Craney Island site in Portsmouth, Virginia. The definitive, firm-fixed price contract has a ceiling value of $2,255,933.00 and a completion date of December 31, 2009. The contract provides for construction services related to the Craney Island civil works project managed by the USACE.
This is a $10,389,670.42 definitive, firm-fixed-price construction contract awarded by the U.S. Army Corps of Engineers (USACE) to Norfolk Dredging Company, a for-profit maritime infrastructure maintenance contractor. The contract is for the mechanical dredging and debris removal of the top 4 feet of soil material within a portion of the Craney Island Eastward Expansion project's main dike in Portsmouth, Virginia. The dredged material is to be hydraulically deposited within the Craney Island...
This contract was awarded by the U.S. Army Corps of Engineers to Coastal Design & Construction, Inc., a for-profit company that provides marine construction services to federal agencies. The $279,059.70 firm fixed-price delivery order is for the Craney Island Dikes Raising To4 project, which involves raising the dikes at the Craney Island Dredged Material Management Area in Portsmouth, Virginia. This contract is not a set-aside and was completed on June 27, 2020. Coastal Design &...

The Department of the Army Corps of Engineers, Engineering District Norfolk awarded Coastal Design & Construction, Inc. a $5.9 million firm fixed price contract to replace Spillway #1 at the Craney Island Dredged Material Management Area in Portsmouth, Virginia. The contract is set aside for total small business concerns under NAICS code 237990. Work will involve demolishing the existing steel and concrete spillway and constructing a new free-standing steel frame spillbox, installing 36-inch HDPE outfall pipelines, building a 100-foot by 100-foot reinforced concrete foundation pad, and placing a 12-inch thick marine mattress at the spillway outlet. The replacement is necessary to maintain functionality as the existing spillway is partially demolished and outfall pipelines replaced between stations 1+80 and 5+25. Performance is required from March 2021 through February 2022.

Generated 12/29/23, 4:44 PM