Definitive Contract SPRTA123C0003
- Not listed
- This is a delivery order contract awarded by the Department of the Air Force Materiel Command Ogden Air Logistics Complex to Northrop Grumman Systems Corp, a subsidiary of Northrop Grumman Corporation, for $1,341,286.00 to provide B-2 composite engineering support for performance-based logistics for the 309th Commodities Maintenance Group at Hill Air Force Base, Utah. The contract is for firm-fixed-price deliverables through March 30, 2025. No set-aside designation was used. Northrop Grumman...
- Northrop Grumman Systems Corp, Aeronautics Systems Division, was awarded a $1.63M firm fixed price delivery order on January 29, 2026, for removal and replacement of the B-2 Spirit stealth bomber's left hand hot trailing edge component (AV-0328). The work is scheduled for completion by September 30, 2026, and will be performed at Whiteman Air Force Base, Missouri. This delivery order was issued without a set-aside designation, reflecting Northrop Grumman's competitive standing as a large prime...
- This is a delivery order awarded by the Ogden Air Logistics Complex, part of the U.S. Air Force Materiel Command, to Northrop Grumman Systems Corporation's Aeronautics Systems Division. The $1,402,783.00 contract is for B-2 Spirit stealth bomber composite drop-in and unscheduled structural repair work. It is a cost-plus-fixed-fee contract that runs through April 29, 2025. Northrop Grumman has a long history of supporting the B-2 fleet through various sustainment, modernization, and upgrade...
- This $84,836,356.87 firm-fixed-price delivery order contract was awarded to Northrop Grumman Systems Corporation, doing business as Northrop Grumman Technical Services, by the Air Force Sustainment Center, a component of the U.S. Air Force Materiel Command. The contract is for the delivery of B-2 bomber tailpipe and forward duct assemblies, supporting the maintenance and overhaul of the B-2 stealth aircraft. Northrop Grumman is the prime contractor and may utilize subcontractors such as Carmin...
- The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded Northrop Grumman Systems Corporation a $13.5 million delivery order contract to perform 2018 B-2 AFT DECK REMOVAL AND REPLACEMENT work. Northrop Grumman Aeronautics Systems Division will serve as the prime contractor. Major subcontractors include Coast Aerospace Manufacturing, Inc., Eta Global, Inc., and U.S. Tool Grinding, Inc. doing business as US Tool Group. The contract is a cost-plus-incentive-fee...
- The Department of the Air Force Materiel Command Oklahoma City Air Logistics Complex awarded a $601,826.12 firm-fixed-price delivery order to Northrop Grumman Systems Corp, a subsidiary of Northrop Grumman Corporation, for the B-2 AFT DECK PROGRAM at Whiteman Air Force Base. The contract, which does not have a set-aside designation, was awarded on September 27, 2019 with a completion date of September 29, 2020. As the prime contractor, Northrop Grumman Systems Corp has previously delivered...
- Northrop Grumman Systems Corporation, a subsidiary of Northrop Grumman Corporation, received a $7.4 billion delivery order from the Oklahoma City Air Logistics Complex on May 3, 2023, for contractor logistics support on the B-2 Spirit stealth bomber program. This firm fixed-price order, with an ultimate completion date of June 15, 2026, covers additional efforts including repair and installation of engine removal adapters, radar antennas lift fixtures, and reconstitution of B-2 hydraulic...
- The U.S. Air Force Sustainment Center awarded a $4.6 million firm fixed-price delivery order to Northrop Grumman Systems Corporation for repair and overhaul of B-2 stealth bomber tailpipe ducts and assemblies. The delivery order, issued December 12, 2025, is scheduled for completion by February 15, 2027, with work to be performed in El Segundo, California. This award represents an unrestricted competition with no small business set-aside designation, reflecting Northrop Grumman's competitive...
- This is a delivery order contract awarded by the Oklahoma City Air Logistics Complex, a subordinate unit of the Air Force Materiel Command, to Northrop Grumman Systems Corporation for B-2 Spirit stealth bomber sustainment engineering services. The $35,007,343.10 firm-fixed-price contract has a period of performance through November 30, 2023. No set-aside designation was used for this award. Northrop Grumman, the prime contractor, has subcontracted portions of the work to major aerospace firms...
- This federal contract award was issued by the Oklahoma City Air Logistics Complex, a unit of the U.S. Air Force, to Northrop Grumman Systems Corporation, a major aerospace and defense contractor. The $24,556,978.00 delivery order contract is for B-2 stealth bomber laboratory support services, including software sustainment, engineering, maintenance, prototyping, testing, and specialized parts/equipment delivery. The contract has a completion date of December 31, 2021 and is a firm fixed-price...
The Air Force Sustainment Center awarded a $46.029773 million firm-fixed-price definitive contract to Northrop Grumman Systems Corporation for aircraft rudder and elevon composite flight control surfaces for the B-2 aircraft, including government-furnished property tooling modification, on December 29, 2022, with ultimate completion by November 30, 2028. Place of performance is Beavercreek, OH. The originating solicitation, posted February 28, 2020, sought procurement of one rudder (part 01315) and one elevon (part 01316) with first article testing documentation and certifications, with initial delivery required by July 31, 2023 to Tinker Air Force Base. Subcontractors include Prime Machine, Inc. for precision machining and Hexcel Corp (Salt Lake City Division) for composite materials, along with Advanced Composite Products and Technology, Inc. and Roc-Aire Corp. for hardware and metallic assemblies.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
B-2 FLIGHT CONTROL SURFACES | SPRTA1-20-R-0107 | Defense Logistics Agency Aviation | Pre-Solicitation 1/1 | 2/28/20, 10:01 AM |
ContractNumber | Description | Subcontractor | Prime Award | Dollars Obligated | Updated At |
|---|---|---|---|---|---|
5300054163CO17S | Prime Machine, Inc. | Definitive Contract SPRTA123C0003 | $2.7k | 5/21/26 | |
5300054163CO18S | Prime Machine, Inc. | Definitive Contract SPRTA123C0003 | $9.5k | 5/21/26 | |
5300054163CO14S | Prime Machine, Inc. | Definitive Contract SPRTA123C0003 | $800 | 12/10/25 | |
5300134427CO5S | Hexcel Corp | Definitive Contract SPRTA123C0003 | $14 | 11/20/25 | |
5300134427CO4S | Hexcel Corp | Definitive Contract SPRTA123C0003 | $4.0k | 10/15/25 |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00007 | Other Administrative Action | $0 | 2/17/26 | |
| P00006 | Other Administrative Action | $959.0k | 12/3/25 | |
| ARZ998 | Other Administrative Action | $0 | 8/12/25 | |
| P00005 | Other Administrative Action | $0 | 4/10/24 | |
| P00004 | Other Administrative Action | $0 | 9/13/23 |