Definitive Contract NNX10CA50C
- Not listed
- This is a $4,820,777.00 definitive Cost Plus Fixed Fee contract awarded by the Office of Naval Research (ONR) to Orbia Fluor & Energy Materials USA, Inc. (Silatronix) to develop organosilicon electrolytes for safe, high energy, high nickel Lithium-ion (Li-ion) batteries. The award has an ultimate completion date of June 30, 2024. Silatronix, a manufacturer of goods specializing in organosilicon electrolytes, has previously received multiple contracts from ONR to advance energy storage...
- This is a Small Business Innovation Research (SBIR) Phase I contract awarded by NASA to Materials Modifications Inc., a minority-owned small business. The $125,000.00 firm fixed-price contract is for the development of an aerogel-supported ionic liquid electrolyte for use in high-performance lithium-air batteries. This is intended to address NASA's need for advanced energy storage systems with high specific energy, high volumetric efficiency, greater reliability, reduced parasitic impedance, and...
- This federal contract award to American Lithium Energy Corp. (ALE) is for the development of a high-capacity nano silicon lithium-ion battery with zero-volt tolerance (ZVT) for space applications. The $749,991.00 contract is a Small Business Innovation Research (SBIR) Phase II award from the U.S. Air Force Research Laboratory (AFRL). The firm-fixed-price purchase order is intended to advance ALE's proprietary lithium-ion battery technologies, which the company has previously supplied to agencies...
- Lyten, Inc., a San Jose-based small business specializing in advanced battery technology and materials science, was awarded an $179,887 Small Business Innovation Research (SBIR) Phase I contract by the Air Force Research Laboratory on August 30, 2024. The contract, designated as a total small business set-aside, aims to improve the cycle life of lithium-sulfur (Li-S) battery chemistry by investigating polysulfide (PS) dissolution effects across various advanced battery cell components. The...
- This is a $125,000.00 Small Business Innovation Research (SBIR) Phase I contract awarded by the National Aeronautics and Space Administration (NASA) to NEI Corporation, a self-certified small disadvantaged business located in Piscataway, New Jersey. The contract aims to develop advanced lithium-ion battery technologies to meet the energy storage needs for NASA's extravehicular activities. The program seeks to demonstrate the commercial feasibility of a new class of lithium-ion batteries that...
- Cornerstone Research Group Inc. was awarded a $864,682 Small Business Innovation Research (SBIR) Phase II contract by the National Aeronautics and Space Administration (NASA) to develop an advanced lithium-sulfur battery (LSB) for space exploration systems. The proposed LSB technology combines a novel super-ion conducting ceramic electrolyte, entrapped sulfur cathode, and lithium metal anode to achieve high energy density, rechargeability, and safety. This project directly supports NASA's...
- Silatronix, Inc., a manufacturer of goods, was awarded a $10,152,529.00 definitive contract by the Department of the Navy's Office of Naval Research (ONR) to develop organosilicon electrolytes for safe, high energy, high nickel lithium-ion batteries. The contract, which does not have a set-aside designation, is a cost-plus-fixed-fee type and runs through December 31, 2021. Silatronix, a global leader in fluorspar production, has secured multiple prime contracts with ONR to advance energy storage...
- This is a Small Business Innovation Research (SBIR) Phase II contract awarded by the Air Force Research Laboratory (AFRL) to Cellec Technologies, Inc., a small business located in Rochester, New York. The $749,037 firm fixed-price contract is for the "ENHANCE II ENABLING HYBRID ANODES WITH NANOCARBON ELECTRODES II" research and development project, which is focused on improving lithium-ion battery capacity and functionality. As a Small Business Technology Transfer (STTR) Phase II...
- This is a Small Business Innovative Research (SBIR) Phase II contract awarded by the Defense Logistics Agency (DLA) to Anovion LLC, a small disadvantaged business, for the development of synthetic graphite for use in the production of lithium-ion batteries for military applications. The contract has a firm fixed price of $1,243,170.00 and a period of performance ending on January 24, 2026. The contract was awarded on July 25, 2024 under the DLA SBIR Topic DLA233-003. As an SBIR Phase II...
- This is a $1,899,930.91 Firm Fixed Price contract awarded by the Department of the Army to Graphenix Development, Inc., doing business as Graphene Devices LTD, a self-certified small disadvantaged business. The contract is for the SBIR Phase II research and development of scalable 100% silicon anodes for high-energy density, high-safety, and low-temperature operation lithium-ion batteries. This work supports the Army's requirements for advanced battery technologies, particularly for military and...
FOR THIS PROJECT SUPERIOR GRAPHITE CO. (CHICAGO, IL, USA), THE LEADING WORLDWIDE INDUSTRIAL CARBON MANUFACTURER AND THE ONLY LARGE SCALE BATTERY GRADE GRAPHITIC CARBON PRODUCER IN THE USA, WILL DEVELOP, EXPLORE THE PROPERTIES OF, AND DEMONSTRATE THE ENHANCED CAPABILITIES OF NOVEL NANOSTRUCTURED SILIX-C ANODES, CAPABLE OF RETAINING HIGH CAPACITY AT A RAPID 2 HOUR DISCHARGE RATE AND AT 0OC WHEN USED IN LI-ION BATTERIES. BY THYE END OF PHASE I WE HAVE DEMONSTRATED ADVANCED ANODE MATERIALS WITH THE SPECIFIC CAPACITY IN EXCESS OF 1000 MAH/G, MINIMAL IRREVERSIBLE CAPACITY LOSSES AND STABLE PERFORMANCE FOR 20 CYCLES AT C/1. WE ARE CONFIDENT THAT BY THE DEVELOPING AND APPLYING A VARIETY OF NOVEL NANO-MATERIALS TECHNOLOGIES, FINE-TUNING THE PROPERTIES OF COMPOSITE PARTICLES AT THE NANOSCALE, OPTIMIZING THE COMPOSITION OF THE ANODES, AND CHOOSING APPROPRIATE BINDER AND ELECTROLYTES WE WILL BE ABLE TO REVOLUTIONIZE LI-ION BATTERY TECHNOLOGY. IN ORDER TO ACHIEVE SUCH A BREAKTHROUGH IN POWER CHARACTERISTICS OF LI-ION BATTERIES, THE TEAM WILL DEVELOP NEW NANOSTRUCTURED SILIX-C ANODE MATERIALS TO OFFER UP TO 1200 MAH/G AT C/2 AT 0OC AND A LONG CYCLE LIFE WITH LESS THAN 20% FADING WHEN CYCLED FOR 2000 CYCLES AT C/2 AT 0OC
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 8 | Funding Only Action | $0 | 8/9/12 | |
| 7 | Funding Only Action | $293.1k | 8/4/11 | |
| 6 | Funding Only Action | $50.0k | 6/22/11 | |
| 5 | Funding Only Action | $25.0k | 5/18/11 | |
| 4 | Funding Only Action | $18.8k | 4/8/11 |