This is a definitive, firm fixed price contract awarded by the Department of the Interior Bureau of Reclamation to Gracon LLC, worth $951,238.00, for the GREEN MOUNTAIN POWERPLANT PENSTOCK REHABILITATION project in Colorado. The contract was not set aside for any special program. The work to be performed includes removing and controlling water, rehabilitating existing penstock coatings, and finishing and installing metal fabrications, gates, valves, and electrical features. Key subcontractors...
This firm-fixed-price delivery order was awarded by the Department of the Interior's Bureau of Reclamation to Gracon LLC, a limited liability company, for the "LOWER NV PENSTOCK BELLY DRAINS" project. The potential value of the contract is $435,394.12, with a completion date of May 31, 2022. Gracon LLC is a for-profit, small disadvantaged business organization and a subsidiary of Lynn / Cornerstone Holdings, LLC. The contract does not have a set-aside designation. Gracon has experience...
This is a firm-fixed price construction contract awarded by the Department of the Interior's Bureau of Reclamation to Gracon LLC, a small business contractor, for modifications to the Paonia Dam outlet works in Paonia, Colorado. The contract has a potential value of $4,321,922.60 and includes tasks such as hydro-demolition, installation of new concrete and metalwork, and fabrication and installation of new gates and trashracks. This contract was set aside for total small business...
This is a firm fixed-price delivery order contract awarded by the Department of the Interior Bureau of Reclamation to Gracon LLC, a for-profit limited liability company, for the UPPER ARIZONA PENSTOCK BELLY DRAINS project. The contract has a completion date of June 15, 2019 and a potential value of $316,514.34. Gracon is an industrial construction company that has been awarded numerous federal contracts and subcontracts to provide specialized construction, maintenance, and equipment supply...
This federal contract award, with a ceiling value of $1,468,166.00, was issued by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to the prime contractor Gracon LLC for the modification of high pressure gates at the Lemon Dam. The contract was set aside for total small business participation. As part of this award, Gracon LLC has subcontracted with several companies, including CSI Acquisition Co LLC dba Crane Service Inc. for crane services, Ballard...
This is a $855,600.00 firm fixed-price contract awarded by the U.S. Army Corps of Engineers to Gracon LLC, a small business contractor, to construct service gates and operators at the El Dorado Dam in Kansas. The contract was set aside for small business participation. Gracon LLC is the prime contractor, and it has subcontracted work to two firms: Hartman-Walsh Painting Company for blasting and coating services, and Johnson Machine Works, Inc. for fabricating steel components. The original...
This is a delivery order awarded by the Department of the Interior Bureau of Reclamation to Gracon LLC, a for-profit limited liability company, for the completion of a BENCH & WAREHOUSE TANK WATER SUPPLY LINE project in Boulder City, Nevada. The firm-fixed-price contract has a potential value of $1,255,435.24 and a completion date of May 31, 2020. Gracon LLC is a prime contractor that has been awarded numerous federal contracts and subcontracts, including multiple award IDIQ contracts with...
Gracon LLC was awarded a $810,403 delivery order against an unidentified government-wide acquisition contract by the U.S. Army Corps of Engineers to perform spot painting of Penstocks Numbers 6 and 8. The firm fixed price order calls for Gracon to paint portions of the identified hydroelectric structures located in Pickstown, South Dakota between October 2020 and October 2021. As a small business set-aside awarded through the Corps' civil works program, the order aims to maintain critical...
This federal contract, awarded by the U.S. Army Corps of Engineers (USACE) Tulsa District, provides for the rehabilitation of the J. Redmond Gate 3 trunnion assembly at J. Redmond Lake in Kansas. The $554,735.00 firm-fixed-price contract was awarded to Gracon LLC, a limited liability company, on September 29, 2016. The contract was not set aside for any type of small business. As the prime contractor, Gracon LLC is responsible for providing all materials, equipment, labor, and subcontractors...
This is a $838,096.95 firm fixed-price definitive contract awarded by the Department of the Interior's Bureau of Reclamation to Gracon LLC, a small business prime contractor, for the NK-CAWKER CITY & DOWNS PUMP REPLACEMENT project in Cawker City, Kansas. The contract includes pump supply, crane services, and other construction-related services provided by subcontractors such as ACE Consulting Company LLC, Mid-America Pump LLC, Hess Services, Inc., Cogent, Inc., and MWI Corporation. This...