Definitive Contract INR11PC81320
Award Date 6/6/11
Potential Completion Date 6/30/13
Potential Value $130K
Federal Agency
Ultimate Awardee
Not listed NAICS Category
PSC Category
Not listed Federal Contract Vehicle
- Not listed
Set-Aside Type
No Set-Aside Used
Extent Competed
Not Competed
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Olympia, WA, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Service Contract Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This is a $6,693,301.52 firm-fixed-price delivery order contract awarded by the Bureau of Reclamation's Lahontan Basin Area Office (LBAO) to Stantec Consulting Services Inc. for a Tahoe Dam Replacement Feasibility Study. The contract has been extended by 20 months, with a new ultimate completion date of May 31, 2027. As the prime contractor, Stantec will lead the feasibility study, which includes services such as economic analysis, alternatives evaluation, hydrologic analysis, and formulation of...
- The U.S. Army Corps of Engineers awarded a $130,269 delivery order to Hdr-Gannett Fleming JV for the Folsom Dam Non-Linear IEPR. As part of the Corps' dam safety program, the contractor will conduct an independent external peer review of the Folsom Dam non-linear seismic analysis model and technical approach. Hdr-Gannett Fleming JV will perform the independent review services in Folsom, California from March through June 2021 on a firm fixed price basis. The prime contractor is a joint venture...
- This is a $1,337,348.65 firm-fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers to the HDR GEI Joint Venture, a partnership between HDR, Inc. and CH2M. The contract is for the preparation of water control manual update management plans for multiple dams in the Truckee River Basin in Nevada and California, as well as the Pine Flat Dam and Lake on the Kings River and the Buchanan Dam-H.V. Eastman Lake on the Chowchilla River in California. The contract is a task...
- The Bureau of Reclamation awarded a $45.8 million firm fixed-price definitive contract to NW Construction, Inc. on March 7, 2023, for modifications to Fresno Dam located in Hill County, Montana, as part of the Milk River Project. The contract is scheduled for ultimate completion by March 12, 2026. NW Construction, Inc., a small disadvantaged business based in Bozeman, Montana, specializes in critical water infrastructure projects with demonstrated expertise in dam construction and rehabilitation...
- This federal contract award to Aterra-Schnabel Joint Venture, a small business joint venture, is for a Firm Fixed Price Delivery Order to conduct a physical model study of the Prado Dam in Riverside County, California. The $2,003,024.12 award was made by the U.S. Army Corps of Engineers, a defense agency, on June 16, 2021, with a period of performance through April 30, 2024. The contract supports the Corps' mission to ensure dam safety and mitigate flood risks through infrastructure evaluation...
- This $4,554,466.11 firm-fixed-price delivery order was awarded to HDR GEI Joint Venture, a partnership between HDR, Inc. and CH2M, by the U.S. Army Corps of Engineers (USACE). The contract, which has no set-aside designation, is part of the USACE's larger Dam and Levee Safety Program Design Services indefinite-delivery/indefinite-quantity (IDIQ) contract. Under this delivery order, HDR GEI Joint Venture will provide services to update the water control manuals for five dams in California:...
- The Department of the Interior Bureau of Reclamation awarded a $374,000 purchase order to River Focus, Inc., doing business as River Focus Inc., to provide hydrologic and hydraulic analysis services in support of the Truckee Basin Water Management Options Pilot study. The contractor will update rain and snowmelt flood frequency curves, calibrate and validate hydraulic models, develop a synthetic incremental flow hydrograph, and identify channel capacity and breakout points. This requirement...
- The Department of the Army Corps of Engineers awarded a $865,262 firm fixed price delivery order to Stantec Tetra TECH JV II for non-linear finite analysis of Folsom Dam in Folsom, California. Under the contract, the prime contractor will perform follow-on engineering analysis of the dam to support the Corps' dam safety program. Work will be conducted onsite in Folsom and is required to be completed by October 2021. No subcontractors or set aside designations were identified. The award is...
- This is a firm fixed-price delivery order contract awarded by the U.S. Army Corps of Engineers (USACE) Sacramento District to HDR Fugro WLA for hydraulics design review and engineering support during construction of the Folsom Dam Joint Federal Project (Folsom JFP) in Folsom, California. The contract has a ceiling value of $101,827.31 and a completion date of October 27, 2018. It is not a set-aside contract. The Folsom JFP is a collaborative effort between USACE and the U.S. Bureau of...
- The U.S. Army Corps of Engineers awarded a $721,863.95 firm fixed price delivery order to Stantec Consulting Services Inc. to provide design services for the Folsom Dam Auxiliary Spillway - Hydraulic Cylinder Replacement project located in Folsom, California. Stantec will develop plans and specifications to replace hydraulic cylinders at the spillway under the two-year contract starting in June 2021. BMT Canada LTD was identified as a major subcontractor to assist with the design work. The...
HYDROLOGY STUDY - FRIANT DAM MODIFICATIONS
Posted 6/6/11
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 5 | Supplemental Agreement for work within scope | $0 | 12/28/12 | |
| 4 | Supplemental Agreement for work within scope | $21.2k | 6/26/12 | |
| 3 | Supplemental Agreement for work within scope | $28.5k | 3/19/12 | |
| 2 | Supplemental Agreement for work within scope | $0 | 2/23/12 | |
| 1 | Other Administrative Action | $0 | 1/19/12 |