Definitive Contract INP10PC76792
Award Date 4/26/10
Potential Completion Date 10/13/11
Potential Value $5.3M
Federal Agency
Ultimate Awardee
Not listed PSC Category
Federal Contract Vehicle
- Not listed
Set-Aside Type
HUBZone
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Denali National Park and Preserve, Alaska, USA
Solicitation Procedures
Negotiated Proposal / Quote
Number Of Offers Received
6
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- The Department of the Interior National Park Service awarded a $4,043,082.14 firm-fixed-price contract to Dirtworks, Inc., a small business, for the rehabilitation of the Toklat utility infrastructure located in Denali National Park and Preserve, Alaska. The work includes the replacement of the water distribution, electrical distribution, and sanitary sewer collection and disposal systems. This was a total small business set-aside contract, with the work to be completed by September 1, 2017. The...
- This definitive firm-fixed price contract valued at $2,322,629.43 was awarded by the Department of the Interior National Park Service National Office to Pruhs Construction Co., L.L.C. to rehabilitate water and sewer utilities at Denali National Park and Preserve in Alaska. The work involves installing approximately 1,700 feet of 3-inch water main, 4,000 feet of 8-inch sewer main, and 20 manholes, as described in Solicitation Denali Frontcountry Water & Sewer Rehabilitation for Riley Creek...
- This federal contract was awarded by the Department of Transportation Federal Highway Administration (FHWA) to Pruhs Construction Co., L.L.C., a for-profit limited liability company, to repave the Denali Park Road in Denali National Park and Preserve, Alaska from mile marker 3.4 to 14.9. The $5,635,971.74 firm-fixed price contract has a completion date of September 17, 2016 and was set aside for total small business participation. Major subcontractors include Specialized Pavement Marking, LLC...
- <p>This is a fixed-price purchase order awarded by the National Park Service, a civilian federal agency, to Group14 Engineering, PBC, a small disadvantaged business. The $50,857.06 contract is for recovery services related to the emergency services building at Denali National Park in Alaska. The contract does not have a set-aside designation. The award was made on May 10, 2010 with a completion date of November 1, 2012.</p>
- This federal contract award, valued at $157,678.34, was issued by the National Park Service (NPS) to HDR Engineering Inc. (HDR), a large, employee-owned engineering and architectural firm. The contract is for RECOVERY DENA PMIS 023409 SUBMITTAL REVIEW, OFFICE SERVICES, SITE VISITS AND AS-BUILT DRAWINGS for the Front Country Wastewater Treatment System at Denali National Park in Alaska. The award is a Firm Fixed Price Delivery Order, with a completion date of June 30, 2012. This work is not under...
- This is a $8,140,651.00 firm fixed price definitive contract awarded by the National Park Service, a civilian agency, to Dawson Construction, LLC for the construction of an emergency services building and utilities at Camp Denali in Denali National Park and Preserve, Alaska. The contract is for the "RECOVERY DENA 023411 AND 113503 CONSTRUCTION OF THE EMERGENCY SERVICES BUILDING AND UTILITIES AT C CAMP DENALI NATIONAL PARK, AL" and does not have a set-aside designation. The contract was...
- <p>This is a firm fixed-price delivery order awarded by the National Park Service (NPS) to Amec E&I, Inc., a subsidiary of AMEC PLC, for on-site construction management services during the construction of the Front Country Wastewater System in Denali National Park in Alaska. The award, valued at $387,176.88, does not have a set-aside designation. The order is for services to be provided until the ultimate completion date of July 30, 2012.</p>
- This is a $5,939,887.95 firm fixed price definitive contract awarded by the Federal Highway Administration, a civilian agency, to Granite Construction Company for the Denali Park Road repaving project in Alaska. The project involved repaving a 11.3 mile stretch of the Denali Park Road from mile marker 3.4 to 14.7, designated as AK NPS DENA 10(44). The contract did not have a set-aside designation. Granite Construction Company, a prominent construction services provider, has performed various...
- This is a $2,893,234.29 firm fixed price definitive contract awarded by the Federal Highway Administration, a civilian agency, to Ahtna Construction & Primary Products Company, LLC (AC&P), an Alaskan Native Corporation-owned small disadvantaged business. The contract is for flood mitigation work on the Herman Leirer Road (Exit Glacier Road) in Kenai Fjords National Park, Alaska. The contract is set aside for total small business. AC&P has subcontracted with North Star Paving &...
- This is a $213,984,157.43 firm-fixed-price definitive contract awarded by the Federal Highway Administration, a civilian agency, to Granite Construction Company. The contract involves two phases: pre-construction services and construction services for improvements to the Polychrome area of Denali National Park in Alaska. The project will span an active landslide with a 475-foot bridge, stabilize rock masses, realign the road, and install a retaining wall. This award is not a set-aside and...
This is a $5,324,051.41 firm-fixed-price definitive contract awarded by the National Office of the National Park Service, a civilian agency, to North Star Paving & Construction Inc., a HUBZone-certified small disadvantaged business. The contract is for the replacement of the front country wastewater treatment facility and rehabilitation of the collection system at Denali National Park and Preserve in Alaska. The contract was awarded on April 26, 2010 with a completion date of October 13, 2011.
Generated 4/2/25, 9:53 AM
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
RECOVERYReplace Front Country Wastewater Treatment Facility and Rehabilitate Collection System | N2011101028 | Department of the Interior National Park Service | Award Notice 1/1 | 2/9/10, 10:17 AM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| 11A | Change PIID | $0 | 11/15/12 | |
| 11 | Other Administrative Action | $0 | 9/25/12 | |
| 10 | Definitize Change Order | ($4k) | 8/30/12 | |
| 8 | Supplemental Agreement for work within scope | ($135k) | 9/22/11 | |
| 7 | Supplemental Agreement for work within scope | $38.0k | 9/19/11 |