Features
Get A Demo
Plans
Sign Up
Login
All Federal Contract Awards
Help
Definitive Contract IBM17C0001
Award Date
12/14/16
Potential Completion Date
12/31/21
Potential Value
$21M
Overview
🤔 AI Insights
Buyer Personas
Industry Personas
Buyer Personas In this Market
6
Activity
Transactions
8
Subawards
Opportunity Stack
1
Federal Agency
International Boundary and Water Commission U.S.-Mexico
Awardee
Meridian Engineering Co
Ultimate Awardee
Not listed
NAICS Category
237990 - Other Heavy and Civil Engineering Construction
PSC Category
Y1PZ - Construction Of Other Non-Building Facilities
Federal Contract Vehicle
Not listed
Set-Aside Type
Total Small Business
Extent Competed
Full and Open Competition after exclusion of sources
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
El Paso, TX 79922, USA
Solicitation Procedures
Sealed Bid
Number Of Offers Received
3
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Description
Update #1
REPLACEMENT OF THE AMERICAN CANAL UPPER REACH
Posted 12/14/16, 12:00 AM
Name
Description
Solicitation Number
Federal Agency
Type
Posted Date
(Click to sort descending)
Replacement of American Canal-Upper Reach
Added: Jul 07, 2016 5:21 pm Replacement of the American Canal-Upper Reach in El Paso, TexasGeneral Description of the Work - The work for this project generally consists of the demolition of reinforced concrete open channel canal, and replacement with a new open canal and a reinforced concrete closed conduit flow conveyance structure. This proposed project is part of a larger project to rebuild the deteriorated, concrete-lined American Canal, which is located in El Paso, Texas. The American Canal begins at the American Diversion Dam, near the intersection of Executive Center Boulevard and West Paisano Drive (U.S. Highway 85), and extends alongside the Rio Grande for nearly 0.5 mile, where it crosses through a culvert under West Paisano Drive. After exiting this first culvert, the canal runs along the east side of highway for roughly 0.6 mile, where it crosses through a second culvert under West Paisano Drive and exits on the west side adjacent to the Rio Grande. The canal continues downstream for another 0.5 mile, at which point it connects to the Hart's Mill Sedimentation Basin, which is the beginning of the American Canal Extension, near the old West Yandell Drive overpass and the International Diversion Dam in the Rio Grande. The canal is accessible from various access points off West Paisano Drive. The American Canal is subdivided into three segments - upper (upstream), middle, and lower (downstream) segments. Each segment is separated by a highway culvert. Reconstruction of each segment will be performed separately. The work under this contract is for the second phase of the project and is limited to the reconstruction of the American Canal's upper segment only. This upper canal segment extends approximately 0.5 mile from where it begins at the diversion of American Dam and enters the first highway culvert under West Paisano Drive. The existing canal has a flow capacity of 1,200 cubic feet per second (cfs). The capacity of the new canal system will be increased to 1,535 cfs. Major Construction Tasks(1) Preparation of right of way (clearing and grubbing).(2) Construction of ramps.(3) Demolition and disposal of existing reinforced concrete canal.(4) Construction of new canal lining, cast-in-place reinforced concrete transitions, and rectangular-shape culvert sections of the canal.(5) Dewatering and possible treatment of contaminated groundwater.(6) Removal and disposal of contaminated soils and replacement with clean (non-contaminated), suitable backfill.(7) Cleaning and removing debris from jobsite.(8) Reestablishment of embankments and roadways. The magnitude of this project is more than $10,000,000.Performance Period -The canal and necessary structure work for conveyance of irrigation waters shall be constructed during the non-irrigation season, which typically runs from October 15 to February 28. Only work that does not impact on the system's ability to deliver irrigation water (i.e. staging, construction/restoration of berms, fences, grounds, vegetation, etc.) may continue into the irrigation season. Solicitation, plans and specifications are expected to be posted on or about July 22, 2016 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by July 22, 2016 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.This is a Presolicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid which will be considered by the agency.This is not an invitation for bid. Please do not submit a bid response to this Presolicitation Notice.
IBM16B0003
International Boundary and Water Commission U.S.-Mexico
Award Notice 1/1
7/7/16, 5:21 PM
Mod #
Description
Reason For Modification
Federal Obligation
(Click to sort descending)
Date
(Click to sort ascending)
P00014
EXTEND POP
Supplemental Agreement for work within scope
$0
9/24/21
P00012
PLUS/MINUS WORK AND EXTEND POP
Supplemental Agreement for work within scope
$0
3/10/20
P00011
DEFINITIZE MODS P00005 & P00006
Definitize Change Order
$400.0k
12/6/19
P00009
EXTEND POP
Supplemental Agreement for work within scope
$0
8/26/19
P00007
EXTEND PERIOD OF PERFORMANCE
Supplemental Agreement for work within scope
$0
5/2/19