Definitive Contract FA868126CB001
- Not listed
- The Boeing Company was awarded a $3.44 million firm-fixed-price delivery order by the Air Force Life Cycle Management Center (AFLCMC) at Eglin Air Force Base on August 31, 2023, for the Massive Ordnance Penetrator (MOP) Tail Kit Retrofit III program. This delivery order, with an ultimate completion date of June 1, 2026, supports the production and sustainment of tail kit assemblies for the MOP system, a major defense acquisition program that develops large, precision-guided, air-dropped...
- The Air Force Life Cycle Management Center (AFLCMC) at Eglin Air Force Base awarded The Boeing Company a definitive cost-plus-fixed-fee contract valued at $13.7 million for Massive Ordnance Penetrator (MOP) Modification Phase III, with a completion date of May 19, 2026. The MOP is a Major Defense Acquisition Program under the Major Capability Acquisition pathway that develops and sustains a large, precision-guided, air-dropped conventional munition designed to destroy hardened, deeply buried...
- The Department of the Air Force Materiel Command Lifecycle Management Center awarded a firm fixed price delivery order against an existing contract vehicle to The Boeing Company. The $78,592 order is for contractor logistics support for the Massive Ordnance Penetrator (MOP) under the major defense program known as the Massive Ordnance Penetrator. Performance will take place in St. Louis, Missouri with an estimated completion date of August 8, 2019. As the prime contractor, Boeing will provide...
- This contract is a delivery order awarded by the Air Force Life Cycle Management Center (AFLCMC) at Eglin Air Force Base to The Boeing Company for Contractor Logistics Support of the Massive Ordnance Penetrator (MOP) program. The MOP is a major defense program for the U.S. Department of Defense. The $365,812.65 contract is a cost-plus-fixed-fee arrangement with a completion date of December 30, 2021. There is no set-aside designation noted. As a prime contractor, Boeing has subcontracted a...
- This is a firm-fixed-price delivery order awarded to The Boeing Company for Contractor Logistics Support (CLS) related to the Massive Ordnance Penetrator (MOP) program, a Major Defense Acquisition Program managed by the Department of Defense under the Major Capability Acquisition pathway. The $193,652 contract provides for the "Consideration for Tailkit 39 Repair" and has an ultimate completion date of March 3, 2025. The Air Force Life Cycle Management Center at Eglin Air Force Base is...
- The Department of the Air Force Materiel Command Lifecycle Management Center awarded a $1,511,122 firm fixed price delivery order to The Boeing Company for contractor logistic support under the Massive Ordnance Penetrator program. Boeing will provide propulsion from L3 Fuzing And Ordnance Systems, Inc., electromechanical and hydraulic (EHM) systems from Simmonds Precision Products Inc., technology from Alliant Techsystems Operations LLC, and additional propulsion from Chemring Energetic...
- The Department of the Air Force Materiel Command Lifecycle Management Center awarded The Boeing Company a $159,684 firm fixed price delivery order contract for contractor logistics support. The contract is associated with the Massive Ordnance Penetrator major defense program and has a period of performance through March 2021. No set-aside designation was used for this award. As the prime contractor, Boeing will provide logistics support for the Massive Ordnance Penetrator, a 30,000-pound...
- This is a firm-fixed-price delivery order awarded to The Boeing Company under the Massive Ordnance Penetrator (MOP) Major Defense Acquisition Program managed by the Department of Defense. The $924,466 contract provides contractor logistics support for the MOP system, which includes the penetrator warhead, tailkit assemblies, mission computers, and associated equipment. The Air Force Life Cycle Management Center at Eglin Air Force Base is the primary funding agency. The contract has a period of...
- The Department of the Air Force Materiel Command Lifecycle Management Center awarded a $993,096 firm fixed price delivery order to The Boeing Company under the Massive Ordnance Penetrator (MOP) Contractor Logistics Support contract vehicle. This order provides logistics support for the MOP, a 30,000-pound bunker buster bomb developed for penetrating hardened underground structures. As the prime contractor, Boeing will deliver logistics services for the MOP program through December 2021 at...
- The Department of the Air Force Materiel Command Lifecycle Management Center awarded a $105,363 firm fixed price delivery order contract to The Boeing Company to provide logistics support for the Massive Ordnance Penetrator (MOP) program. As the prime contractor, Boeing will deliver contracted logistics services in support of the MOP, a major defense program of the Air Force that develops bunker buster bombs. Performance will occur in St. Louis, Missouri under the multiple award indefinite...
The Air Force Life Cycle Management Center at Eglin Air Force Base awarded a $125.61 million definitive contract to The Boeing Company on February 20, 2026, for 27 Massive Ordnance Penetrator tailkits and 15 components under a cost-plus-fixed-fee pricing structure, with no set-aside designation. Place of performance is Berkeley, MO. The contract extends through September 30, 2028. The Massive Ordnance Penetrator is a Major Defense Acquisition Program (MDAP) under the Major Capability Acquisition pathway with Acquisition Category IC designation, developing and sustaining a large, precision-guided, air-dropped conventional munition designed to destroy hardened, deeply buried targets. The MOP system includes the primary penetrator warhead, tailkit assemblies, mission computers, and associated support equipment.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $61.5m | 2/19/26 |