Definitive Contract FA301625C0029
- Not listed
- Nexlegacy LLC, an SBA Certified 8(a) Program Participant, was awarded a definitive firm fixed-price contract valued at $475,496.55 by the Air Education and Training Command (AETC) to design and install a new structural support system for an existing elevated walkway connecting Buildings 2000 and 2007 at Lackland Air Force Base in San Antonio, Texas. The contract, awarded on September 9, 2025, is designated as an 8(a) sole source procurement, reflecting the set-aside status reserved for small...
- This $178,000 firm fixed-price contract was awarded on September 30, 2024, to JVR LLC, a San Antonio-based small business certified as an 8(a) Program Participant by the Small Business Administration. The contract, designated as an 8(a) sole source set-aside, covers fiber optic installation services to Buildings 7358 and 7356 at Joint Base San Antonio-Lackland (JBSA Lackland) in Texas, with an ultimate completion date of September 29, 2025. The Air Force Materiel Command, under the Department of...
- This firm-fixed-price delivery order was awarded under the Joint Base San Antonio (JBSA) Non-Complex Construction 2020-2030 Indefinite Delivery Indefinite Quantity (IDIQ) contract. The work includes labor, materials, and equipment required to perform fiber expansion between a cable vault and a relocatable shelter at Lackland Air Force Base in San Antonio, Texas. The $131,069.73 contract was awarded on October 1, 2023 to the minority-owned, Hispanic American-owned small business King &...
- This is a firm fixed-price purchase order contract awarded by the Air Force Materiel Command (AFMC) to Black Wave Design And Development LLC, a service-disabled veteran-owned small business (SDVOSB) and small disadvantaged business, for $56,118.14. The contract requires the contractor to engineer, furnish, install, and test a LAK-DS pair-gain modem upgrade-replacement for Building 10330 at Lackland Air Force Base. This contract was set aside for small businesses and is associated with a larger...
- The U.S. Air Force Materiel Command awarded a $168,423.51 firm fixed-price delivery order to Optivor Technologies, LLC, a Women-Owned Small Business headquartered in Orlando, Florida, for fiber optic installation work at JBSA Lackland in Belle Isle, Florida. The project involves installing outside plant fiber infrastructure to support 37 training dormitories, with an ultimate completion date of April 8, 2025. This award was made under the Information Technology Enterprise Solutions 3 -...
- This is a $366,068.47 firm fixed-price delivery order awarded by the Department of the Air Force Materiel Command to Technica Corporation, a for-profit, self-certified HUBZone joint venture corporation. The contract is for OSP cable and manhole/duct system installation to support three fiber projects at Joint Base San Antonio, Lackland, Texas. The contract is a task order under the Network-Centric Solutions II (NETCENTS II) indefinite-delivery, indefinite-quantity (IDIQ) contract vehicle,...
- This is a $139,035.23 firm-fixed-price delivery order awarded by the Air Force Materiel Command (AFMC) to Mclane Advanced Technologies LLC, operating as EDC Consulting, a small business. The contract is for the installation of single-mode fiber optic cable and upgrades to pair-gain modems at Lackland Air Force Base under the Information Technology Enterprise Solutions 3 - Services (ITES-3S) indefinite-delivery/indefinite-quantity (IDIQ) contract vehicle. The work to be performed includes...
- <p>This is a sole source 8(a) delivery order awarded by the Air Education and Training Command (AETC) to Bowhead Support Group LLC, an Alaskan Native Corporation-owned firm, for the installation of fiber optic cable. The $230,544.78 firm fixed price contract has a completion date of January 2, 2017 and was awarded on July 23, 2015. The work is to be performed at Goodfellow Air Force Base in Texas.</p>
- The U.S. Air Force Materiel Command awarded a $235,841 firm fixed-price delivery order to Velocity / CFM JV, LLC for the installation of 12 single-mode diverse fiber optic pathways connecting Core Node 990 to the Core Edge Building 900 at Joint Base San Antonio-Randolph, Texas. The work is scheduled for completion by December 17, 2025, and represents critical infrastructure modernization supporting the base's communications and data network capabilities. This delivery order was issued under...
- Superior Government Solutions LLC (SGS) has been awarded a $66,200.07 firm fixed price delivery order for fiber optic cable installation at Lackland Air Force Base in San Antonio, Texas. The contract is associated with the Information Technology Enterprise Solutions 3 - Services indefinite-delivery/indefinite-quantity contract vehicle, referred to as ITES-3S, which is sponsored by the Department of Defense to provide a wide range of IT solutions and services in support of Air Force Materiel...
The U.S. Air Force Materiel Command awarded a definitive firm fixed-price contract to Nexlegacy LLC on September 19, 2025, to furnish, install, and test new fiber optic cable infrastructure at Lackland Air Force Base in San Antonio, Texas. The contract, valued at approximately $2.77 million, encompasses the complete installation of fiber optic cable systems to support communications and data transmission capabilities at the installation. The work must be completed by April 20, 2026, providing the Air Force with enhanced network infrastructure to support operational requirements at this critical Air Force base. This contract was awarded as an 8(a) sole source set-aside under SBA Requirement Number WA1741786994R, reflecting Nexlegacy LLC's status as an SBA Certified 8(a) Program Participant. The 8(a) designation indicates the contract was reserved exclusively for a small disadvantaged business, with Nexlegacy's certification valid through July 8, 2029. As a sole source award, the contract was made directly to this vendor without competitive bidding, streamlining the procurement process while supporting small business development objectives within the federal contracting framework.
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $2.8m | 9/19/25 |