Definitive Contract AG91T5C100008
Award Date 4/5/10
Potential Completion Date 5/14/10
Potential Value $39K
Federal Agency
Awardee
Ultimate Awardee
Not listed PSC Category
Not listed Federal Contract Vehicle
- Not listed
Set-Aside Type
8(a) Sole Source
Extent Competed
Not Available for Competition
Major Defense Program
Not listed Pricing Type
Firm Fixed Price
Place of Performance
Arcadia, CA 91006, USA
Solicitation Procedures
Only One Source
Number Of Offers Received
1
Legislative Mandate
Davis Bacon Act
National Interest Action
Not listed Research Type
Not listed Primary Consortia Member
Not listed Similar Awards
- This firm-fixed-price $39,882.00 contract was awarded by the Department of the Interior's National Park Service Northeast Region to Total Solution LLC, a self-certified small disadvantaged business and small business joint venture, to perform fire pump repair services at the Easton Building in Boston National Historical Park in Boston, Massachusetts. The contract was awarded under a total small business set-aside with a 14-calendar day performance period from August 18, 2025, to September 1,...
- The General Services Administration Public Buildings Service Region 2 (GSA - PBS) awarded Integrated Construction Enterprises Inc. a delivery order under the PBS R2 General Construction and Design-Build Construction Services indefinite-delivery indefinite-quantity (IDIQ) master contract to replace the fire pump at 26 Federal Plaza in New York, New York. The project will involve replacing the existing fire pump at the 44th floor of the building located at 26 Federal Plaza in New York, New York...
- <p>The General Services Administration Public Buildings Service National Capital Region awarded Signature Renovations LLC a $283,100 firm fixed price delivery order contract to replace a fire pump at the Vernon Avenue Northwest building in Washington, D.C. The contract has a period of performance starting June 6, 2022 through January 9, 2023 for Signature Renovations LLC to provide the specified fire pump replacement services at the listed location.</p>
- All-Rite Construction, Inc. has been awarded a firm fixed price delivery order valued at forty-nine thousand three hundred fifteen dollars and sixty-one cents ($49,315.61) by the Department of the Interior National Park Service Intermountain Region to remove and replace the existing five hundred gallon per minute (500 GPM) fire pump and motor rated at sixty-five pounds per square inch (65 PSI) at the Amistad National Recreation Area Visitor Center in Fritch, Texas. Work will include...
- This is a firm fixed-price purchase order issued by the Bureau of Reclamation, a civilian federal agency, to RM Mechanical Inc. for the repair of a lift station pump at a water lab. The contract has a ceiling value of $3,534.00 and an ultimate completion date of March 14, 2025. The contract does not have a set-aside designation. No additional subcontractors are mentioned. The Bureau of Reclamation is responsible for managing water resources in the western United States, and this contract...
- This is a firm fixed-price delivery order awarded by the Defense Logistics Agency (DLA) to Hibiya Engineering, Ltd. for the repair and repainting of the exterior as well as the removal of asbestos-containing material (ACM) from the roof and walls of Pump Station Building 134 in Tsurumi, Japan. The contract is part of the NAVFAC Kanto Plains Japan Construction 2014-2019 multiple-award construction contract (MACC) vehicle. The contract has a ceiling value of $160,000.00 and a completion date of...
- The Air National Guard awarded a $986,963 Firm Fixed Price definitive contract to Cody M Stevens Construction Inc. (doing business as CMS Construction) for the repair of Building 1203 Pump House at Port Hueneme, California. The project, designated as a Total Small Business set-aside, involves the demolition of existing diesel fire pump systems and replacement with new electric motor fire pumps, associated electrical components, and related infrastructure to support fire suppression systems for...
- The Department of the Interior National Park Service Midwest Region awarded a $15,119 purchase order to Boyer Fire Protection LLC of St. Louis, Missouri to repair the dry pipe system between the standpipe and maintenance building. The firm fixed price contract runs from July 19, 2023 through August 31, 2023 to deliver the requested repair services. No additional details were provided regarding subcontractors or the National Park Service's programs. The award does not appear to have any set aside...
- The Department of the Interior Bureau of Reclamation awarded a $359,153.88 firm fixed price purchase order to Prime Time Coatings, Inc. to perform pump and motor repairs at the Columbia River Pumping Plant in Hermiston, Oregon. The solicitation sought repairs to a vertical pump weighing less than 20,600 pounds and a 2,500 horsepower inverter duty motor weighing 20,600 pounds located at the facility. Under the contract, the woman-owned small business prime contractor will disassemble, inspect,...
- The U.S. Army Corps of Engineers awarded a $400,731.00 firm fixed-price purchase order to Pentair Pump Group, Inc. (doing business as Fairbanks Morse Pump) for long-term repairs to Pump #1, Pump #2, and Pump #3 at the Big Creek Pump Station Facility in Saylorville Lake, Johnston, Iowa. The contract has an ultimate completion date of January 16, 2016 and was not designated as a set-aside. The contract was awarded by the Rock Island District (ENDIST Rock Island) of the U.S. Army Corps of...
STATION FIRE PUMP HOUSE REPAIR
Posted 4/5/10
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $39.4k | 4/5/10 |