Definitive Contract 191BWC19C0007

Award Date 9/27/19
Potential Completion Date 9/30/22
Potential Value $3.9M
Ultimate Awardee
Not listed
Federal Contract Vehicle
Set-Aside Type
Total Small Business
Extent Competed
Competed under SAP
Major Defense Program
Not listed
Pricing Type
Firm Fixed Price
Place of Performance
El Paso, TX 79922, USA
Solicitation Procedures
Simplified Acquisition
Number Of Offers Received
4
Legislative Mandate
Clinger Cohen Act
National Interest Action
Not listed
Research Type
Not listed
Primary Consortia Member
Not listed
Similar Awards
The International Boundary and Water Commission U.S.-Mexico awarded a definitive $2,089,300.00 firm fixed-price contract to Smithco Construction Inc., doing business as RIO Seco, for sediment removal from the Rio Grande River in Dona Ana North, New Mexico. This contract is designated as a Total Small Business set-aside. The contract was awarded on September 30, 2019 and has a completion date of September 29, 2022. Smithco Construction Inc. has received multiple prime federal contracts,...
The International Boundary and Water Commission U.S.-Mexico awarded a $5,090,480.00 firm fixed-price definitive contract to Smithco Construction Inc., doing business as RIO Seco, for sediment removal services from the Rio Grande River in Dona Ana County, New Mexico. This is a 100% small business set-aside contract. The contract has a completion date of September 30, 2020. This appears to be one in a series of related sediment removal contracts awarded to Smithco Construction Inc. between...
This is a $296,260.02 firm-fixed-price definitive contract awarded by the Albuquerque Acquisition Office, a civilian agency, to Smithco Construction Inc. (doing business as RIO Seco) for the Jicarilla Apache Dorm Sewer Replacement Project. The contract was set aside for total small business participation. Smithco Construction Inc. is a corporate entity that provides sediment removal services from the Rio Grande River to the International Boundary and Water Commission U.S.-Mexico. The company has...
The International Boundary and Water Commission, U.S.-Mexico awarded a $2,349,261.29 firm fixed price contract to Sierra Valley Contractors LLC, an SBA-certified 8(a) small disadvantaged business, to remove accumulated sediment from the Rio Grande River in Sierra County, New Mexico. This requirement was originally solicited as a 100% small business set-aside under NAICS code 237990 - Dredging, with a small business size standard of $36.5 million. The contract has a completion date of September...
This firm-fixed-price definitive contract was awarded by the Air Force Special Operations Command to Smithco Construction Inc., doing business as RIO Seco, to construct a 4-inch gas line. The contract has a ceiling value of $891,692.80 and an ultimate completion date of October 30, 2018. The contract was not set aside for any specific business type. Smithco Construction Inc. has received multiple prime federal contracts, designated as Total Small Business set asides, to remove sediment from...
The U.S. International Boundary and Water Commission awarded a $4,883,531.00 firm-fixed-price contract to Kirkland Construction, L.L.L.P., a for-profit organization, for the Rio Grande Canalization Project Thurman I and II Arroyos Channel Maintenance in Dona Ana County, New Mexico. This is a total small business set-aside contract with a completion date of October 8, 2020. The contract was awarded on September 14, 2018. The International Boundary and Water Commission is responsible for...
This is a $5,365,703.26 firm-fixed-price contract awarded by the U.S. Army Corps of Engineers (USACE) to RME Ltd., LLC, a small business, for the construction of the San Acacia Phase 2C Levee in Socorro County, New Mexico. The contract involves the complete removal of the existing spoil bank and replacement with an engineered levee approximately 1 mile in length, as well as rip rap armoring along the banks of Brown Arroyo and the Rio Grande. The contract was set aside for small businesses and...
This is a federal contract award from the International Boundary and Water Commission U.S.-Mexico, a civilian agency, to Magnus Pacific Corporation, a limited liability company. The contract, valued at $6,324,094.50, is for RECOVERY - URBAN LEVEE REMEDIATION RIO GRANDE AND CIBOLO CREEK FROM STATION 10+00 TO 453+00 in Presidio, TX. The contract is a firm fixed-price definitive contract and has a set-aside designation for total small business. The contract was awarded on August 13, 2010 with a...
This is a firm-fixed-price purchase order awarded by the U.S. International Boundary and Water Commission (IBWC) to Fong Sinn Construction LLC, a minority-owned, small disadvantaged business, for $61,000.10 to repair erosion at the Rio Grande City Gaging Station for the IBWC's Mercedes Field Office. The contract has a total small business set-aside and a completion date of November 15, 2022. The work includes replacing a metal stairway, repairing erosion, and installing erosion protection, as...
This is a Definitive Contract awarded by the International Boundary and Water Commission U.S.-Mexico, a civilian government agency, to Structural Assurance, LLC, a veteran-owned limited liability company. The contract, valued at $1,182,450.00, is for the construction of flood control improvements at the North Floodway and the Union Pacific Railroad Crossing. The contract has a Firm Fixed Price pricing type and a completion date of July 19, 2017. The award was made on September 30, 2016, and...

The International Boundary and Water Commission U.S.-Mexico has awarded a Firm Fixed Price definitive contract to Smithco Construction Inc., doing business as RIO Seco, to perform sediment removal services from the Rio Grande River in Dona Ana South, New Mexico. This $3,912,360.00 contract is set aside for small businesses and has a completion date of September 30, 2022. Smithco Construction Inc. has received multiple prime contracts from the International Boundary and Water Commission to remove sediment from various sections of the Rio Grande River in the Southwest United States, with a total potential value exceeding $16 million.

Generated 3/22/24, 11:43 PM