The Bureau of Reclamation, a civilian agency, awarded a $58,636,993.37 firm-fixed-price definitive contract to Garco Construction, Inc. for the Cle Elum Dam Fish Passage Facility Adult Facility project in the Yakima River Basin, Washington. The project will involve excavation support, reinforced concrete structures, fish screens and intake pipes, miscellaneous metalwork, and earthwork. This contract has no set-aside designation and is expected to be completed by June 1, 2027. Garco Construction,...
This is a firm-fixed-price definitive contract awarded by the Bonneville Power Administration, a civilian agency under the U.S. Department of Energy, to Garco Construction, Inc., a for-profit construction company, for the Chief Joseph Dam Spillway Gates Lifecycle Maintenance project. The contract, valued at $149,248.00, does not have a set-aside designation and was awarded on September 30, 2015, with a completion date of October 22, 2018. Garco Construction, Inc. is an experienced federal...
The U.S. Army Corps of Engineers Louisville District (USACE) awarded a $21,974,000.00 firm-fixed-price definitive contract to Garco Construction, Inc. for the design-build construction of an Equipment Concentration Site (ECS) Warehouse at the Yakima Training Center in Yakima, Washington. The contract has a final completion date of January 7, 2026. The original Special Notice solicitation included sole source requirements for specific door hardware, fire alarm equipment, and utility services to...
This is a $6,026,000.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers, Seattle District (ENDIST Seattle) to Garco Construction, Inc. for the replacement of the passenger and freight elevators at the Chief Joseph Dam Powerhouse in Bridgeport, Washington. The contract has no set-aside designation. The project involves the full replacement of the existing hydraulic freight elevator and electric passenger elevator to bring them up to current code compliance,...
This contract was awarded by the Department of the Interior Bureau of Reclamation to the prime contractor Northbank Civil And Marine, Inc. for the CLE ELUM DAM FISH PASSAGE FACILITY, JUVENILE FACILITY-TUNNEL, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT-INTEGRATED PLAN YAKIMA PROJECT in Cle Elum, Washington. The $22,403,347.40 Firm Fixed Price contract was set aside for small businesses and has a completion date of September 30, 2022. Northbank Civil And Marine, Inc. is a for-profit subchapter S...
This is a $29,073,458.16 firm-fixed-price definitive contract awarded by the Bureau of Reclamation, a civilian agency within the U.S. Department of the Interior, to Greenberry Industrial LLC. The contract is for the delivery of reverse flow gates for the John W. Keys III Pump Generating Plant at the Grand Coulee Dam in Washington. The contract does not have a set-aside designation and has an ultimate completion date of March 17, 2028. Greenberry Industrial LLC is a general industrial...
This is a $2,401,986.05 firm fixed-price definitive contract awarded by the U.S. Bureau of Reclamation, a civilian agency, to Redside Construction LLC, a self-certified small disadvantaged business. The contract is for the CLE ELUM DAM RADIAL GATE MODIFICATIONS project, which involves construction and engineering services, particularly in the coastal and marine environment, to be performed in Cle Elum, Washington. The contract has a set-aside designation for total small business and was...
The U.S. Bureau of Reclamation awarded a $18,760,755.00 firm fixed-price contract to WHH Nisqually Federal Services, LLC, a tribally-owned small business, for the construction of a fish passage facility at the Clear Creek Dam in Yakima, Washington. This contract is part of the Bureau of Reclamation's Yakima Project, which is focused on water resource management and infrastructure in the Yakima River basin. The contract work includes an intake structure, piping and pump, concrete fish ladder, dam...
This is a $10,105,630.51 firm-fixed price contract awarded by the U.S. Army Corps of Engineers to Garco Wemco A Joint Venture for the rehabilitation of the spillway gate assembly at the Albeni Falls Dam in Oldtown, Idaho. The contract involves transporting each of the 11 spillway gates offsite, removing existing coatings, repairing structural deficiencies, replacing roller chains and seals, and reapplying coatings before returning the gates to the dam. Initial funding is available for...
This is a $9,975,000.00 firm-fixed-price definitive contract awarded by the Bonneville Power Administration, a civilian agency within the U.S. Department of Energy, to Garco Wemco A Joint Venture for the rehabilitation of the bridge crane in the Albeni Falls Dam Powerhouse. The original solicitation, issued by the U.S. Army Corps of Engineers, Seattle District, was a small business set-aside for the design, removal, and installation of new bridge crane components including trolleys, hoists,...